My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Bayley Construction | March 12, 2025 Page 7 <br /> File No. 0661-144-00 <br />SCOPE ITEM NO. TASK DESCRIPTION FEE <br />Add Alternate 1 (Task 302) Total $26,250 <br />Task 400. Final Design Support <br />1 Collect groundwater readings (2 reading cycles) $1,600 <br />2 Attend project team meetings and provide consultation during the <br />design phase (assumes 5 1-hr meetings) $7,000 <br />3 Plan and specification review $2,000 <br />Task 400 Total $10,600 <br />BASE SCOPE TOTAL (Tasks 200, 300, 301, and 400) $111,700 <br />TOTAL INCLUDING ADD ALTERNATE 1 (Task 302) $137,950 <br /> <br />This proposal is valid for a period of 60 days commencing from the first date listed above and subject to <br />renegotiation by GeoEngineers, Inc., after the expiration date. <br />There are no intended third-party beneficiaries arising from the services described in this proposal and no <br />party other than the party executing this proposal shall have the right to legally rely on the product of our <br />services without prior written permission of GeoEngineers. <br />Thank you for the opportunity to assist Bayley Construction with the EOMS stadium project. Please contact <br />Erik at 206.239.3234 (direct) or 510.304.8957 (cell) if you have questions or wish to discuss this proposal. <br />Sincerely, <br />GeoEngineers, Inc. <br /> <br />Erik C. Ellingsen, PE Matthew W. Smith, PE <br />Senior Geotechnical Engineer Senior Principal <br />ECE:MWS:nl <br />Attachments: <br />Figure 1. Proposed Explorations <br /> <br />One electronic copy submitted <br />Proprietary Notice: The contents of this document are proprietary to GeoEngineers, Inc. and are intended solely for use by our clients and their design teams <br />to evaluate GeoEngineers' capabilities and understanding of project requirements as they relate to performing the services proposed for a specific project. <br />Copies of this document or its contents may not be disclosed to any other parties without the written consent of GeoEngineers. <br />Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only <br />a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. <br />Copyright© 2025 by GeoEngineers, Inc. All rights reserved. <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.