Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
7 <br />Progressive Design Build General Conditions <br /> <br />2.3 Standard of Care for Design Professional Services. <br />2.3.1 The standard of care for all design professional services performed to execute the Work <br />shall be the (i) the care and skill necessary to comply with the requirements of this Contract and <br />(ii) care and skill ordinarily used by members of the design profession practicing under similar <br />conditions at the same time and locality of the Project, whichever is greater. Notwithstanding the <br />preceding sentence, if Owner’s Initial Programming and Overview contains specific performance <br />standards for any aspect of the Work, the design professional services shall be performed to <br />achieve such standards. <br />2.4 Design Development Services. <br />2.4.1 Design-Builder and Owner shall, consistent with any applicable provision of the Contract <br />Documents, agree upon any interim design submissions that Owner may wish to review, which <br />interim design submissions may include design criteria, drawings, diagrams, and specifications <br />setting forth the Project requirements. Interim design submissions shall be consistent with the <br />Basis of Design Documents, as the Basis of Design Documents may have been changed through <br />the design process set forth in this Section 2.4.1 hereof and Section 2.1.1 of the Contract. On or <br />about the time of the scheduled submissions, Design-Builder and Owner shall meet and confer <br />about the submissions, with Design-Builder identifying during such meetings, among other things, <br />the evolution of the design and any changes to the Basis of Design Documents, or, if applicable, <br />previously submitted design submissions. Changes to the Basis of Design Documents, including <br />those that are deemed minor changes under Section 9.3 hereof, shall be processed in <br />accordance with Article 9. Minutes of the meetings, including a full listing of all changes, will be <br />maintained by Design-Builder and provided to all attendees for review. Following the design <br />review meeting, Owner shall review and approve the interim design submissions and meeting <br />minutes in a time that is consistent with the turnaround times set forth in Design-Builder’s <br />schedule. <br />2.4.2 Design-Builder shall submit to Owner Construction Documents setting forth in detail <br />drawings and specifications describing the requirements for construction of the Work. The <br />Construction Documents shall be consistent with the latest set of interim design submissions, as <br />such submissions may have been modified in a design review meeting and recorded in the <br />meetings minutes. The parties shall have a design review meeting to discuss, and Owner shall <br />review and approve, the Construction Documents in accordance with the procedures set forth in <br />Section 2.4.1 above. Design-Builder shall proceed with construction in accordance with the <br />approved Construction Documents and shall submit one set of approved Construction <br />Documents to Owner prior to commencement of construction. <br />2.4.3 Owner’s review and approval of interim design submissions, meeting minutes, and the <br />Construction Documents is for the purpose of mutually establishing a conformed set of <br />Construction Documents compatible with the requirements of the Work. Neither Owner’s review <br />nor approval of any interim design submissions, meeting minutes, and Construction Documents <br />shall be deemed to transfer any design liability from Design-Builder to Owner. <br />2.4.4 To the extent not prohibited by the Contract Documents or Legal Requirements, Design- <br />Builder may prepare interim design submissions and Construction Documents for a portion of the <br />Work to permit construction to proceed on that portion of the Work prior to completion of the <br />Construction Documents for the entire Work. <br />2.5 Legal Requirements. <br />2.5.1 Design-Builder shall perform the Work in accordance with all Legal Requirements and <br />shall provide all notices applicable to the Work as required by the Legal Requirements.