Laserfiche WebLink
8 <br />Progressive Design Build General Conditions <br /> <br />2.6 Government Approvals and Permits. <br />2.6.1 Design-Builder shall obtain and pay for all necessary permits, approvals, licenses, <br />government charges and inspection fees required for the prosecution of the Work by any <br />government or quasi-government entity having jurisdiction over the Project. <br />2.7 Design-Builder’s Phase 2 Work. <br />2.7.1 Unless otherwise provided in the Contract Documents to be the responsibility of Owner or <br />a separate contractor, Design-Builder shall provide through itself or Subcontractors the necessary <br />supervision, labor, inspection, testing, start-up, material, equipment, machinery, temporary <br />utilities, and other temporary facilities to permit Design-Builder to complete construction of the <br />Project consistent with the Contract Documents. <br />2.7.2 Design-Builder shall perform all construction activities efficiently and with the requisite <br />expertise, skill, and competence to satisfy the requirements of the Contract Documents. Design- <br />Builder shall always exercise complete and exclusive control over the means, methods, <br />sequences, and techniques of construction. <br />2.7.3 Design-Builder shall employ only Subcontractors who are duly licensed in the state of <br />Washington and qualified to perform the Work consistent with the Contract Documents. Owner <br />approves Subcontractors identified in Section 10.3 of the Contract as Key Firms and Key <br />Personnel. Owner may reasonably object to Design-Builder’s selection of any Subcontractor, <br />provided that the Contract Price and/or Contract Time(s) shall be adjusted to the extent that <br />Owner’s decision impacts Design-Builder’s cost and/or time of performance. <br />2.7.3.1 The Design-Builder shall include the language of this sub-paragraph in each of its <br />first-tier subcontracts and shall require each of its Subcontractors to include the <br />same language of this section in each of their subcontracts, adjusting only as <br />necessary the terms used for the contracting parties. Upon request of Owner, <br />Design-Builder shall promptly provide documentation to Owner demonstrating that <br />the Subcontractor meets the subcontractor responsibility criteria below. The <br />requirements of this subsection apply to all subcontractors regardless of tier. At <br />the time of subcontract execution, Design-Builder shall verify that each of its first <br />tier Subcontractors meets the following bidder responsibility criteria: <br />a) If applicable, have a current certificate of registration as a contractor in <br />compliance with Chapter 18.27 RCW, which must have been in effect at <br />the time of subcontract award; (RCW 39.04.350(1)(a) <br />b) Have a current Washington Unified Business Identifier (UBI) number <br />(RCW 39.04.350(1)(b)) <br />c) If applicable, have: <br />i. Industrial Insurance (workers’ compensation) coverage for the <br />subcontractor’s employees working in Washington, as required in <br />Title 51 RCW (RCW 39.04.350(1)(c); <br />ii. A Washington Employment Security Department number, as <br />required in Title 50 RCW (RCW 39.04.350(1)(c); <br />iii. A Washington Department of Revenue state excise tax