My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
16 <br />Progressive Design Build General Conditions <br /> <br />2.12.9 Penalty. When the Design-Builder fails to meet the Apprenticeship goal of 15%, a <br />penalty will be assessed for each hour that is not achieved, unless a Good Faith Effort is <br />approved by the City. Apprenticeship Hours will be measured for each hour of work performed by <br />an apprentice as shown on the Monthly Apprentice Utilization Report, based on certified payrolls <br />or the affidavits of wages paid, whichever is least. The percentage is not rounded up. <br />Apprenticeship Utilization Penalty will be calculated as described below: <br /> <br />Percent <br />of goal <br />met <br />Penalty per hour <br />of unmet goal <br />100% $0.00 <br />90% to <br />99% <br />$2.00 <br />75% to <br />89% <br />$3.50 <br />50% to <br />74% <br />$5.00 <br />1% to <br />49% <br />$7.50 <br />0% $10.00 <br /> <br />2.13 Other Requirements <br />The Design-Builder shall comply with all requirements set forth in the Project Labor <br />Agreement/Community Workforce Agreement, if such an agreement is attached to the GMP <br />Amendment. <br />Article 3 <br />Owner’s Services and Responsibilities <br /> <br />3.1 Duty to Cooperate. <br />3.1.1 Owner shall, throughout the performance of the Work, cooperate with Design-Builder and <br />perform its responsibilities, obligations, and services in a timely manner to facilitate Design- <br />Builder’s timely and efficient performance of the Work and so as not to delay or interfere with <br />Design-Builder’s performance of its obligations under the Contract Documents. <br />3.1.2 Owner shall provide timely reviews and approvals of interim design submissions and <br />Construction Documents consistent with the turnaround times set forth in the Project Schedule. <br />3.1.3 Owner shall give Design-Builder timely notice of any Work that Owner notices to be <br />defective or not in compliance with the Contract Documents. <br />3.2 Furnishing of Services and Information. <br />3.2.1. Provided Information. Design-Builder has access to Provided Information (the <br />“Provided Information”) listed in Exhibit A to the Contract. Provided Information is provided to <br />Design-Builder for information only. Design-Builder understands and agrees that Owner shall not <br />be responsible or liable in any respect for any loss, damage, injury, liability, cost or cause of <br />action whatsoever suffered by Design-Builder by reason of any use of any information contained
The URL can be used to link to this page
Your browser does not support the video tag.