My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
17 <br />Progressive Design Build General Conditions <br /> <br />in the Provided Information or any action or forbearance in reliance thereon. Design-Builder <br />further acknowledges and agrees that (a) if and to the extent Design-Builder or anyone on <br />Design-Builder’s behalf uses any of the information in the Provided Information in any way, such <br />use is made on the basis that Design-Builder, not Owner, has approved and is responsible for <br />such information, and (b) Design-Builder is capable of conducting and obligated hereunder to <br />conduct any and all studies, analyses and investigations as it deems advisable to verify or <br />supplement such information, and that any use of such information is entirely at Design Builder’s <br />own risk and at its own discretion. <br />3.2.2 Except as otherwise provided in the Contract Documents, Owner is responsible for <br />securing and executing all necessary agreements with adjacent land or property owners that are <br />necessary to enable Design-Builder to perform the Work. Owner is further responsible for all <br />costs, including attorneys’ fees, incurred in securing these necessary agreements. <br />3.3 Owner’s Representative. <br />3.3.1 Owner’s Representative shall be responsible for providing Owner-supplied information <br />and approvals in a timely manner to permit Design-Builder to fulfill its obligations under the <br />Contract Documents. Owner’s Representative shall also provide Design-Builder with prompt <br />notice if it observes any failure on the part of Design-Builder to fulfill its contractual obligations, <br />including any errors, omissions, or defects in the performance of the Work. Provided, however, <br />that the failure of Owner’s Representative to provide such notice shall not relieve Design-Builder <br />from the obligation to perform the Work and deliver the Project in a manner consistent with its <br />obligations under the Contract Documents. Owner’s Representative shall communicate regularly <br />with Design-Builder and shall be vested with the authority to act on behalf of Owner. <br />3.4 Government Approvals and Permits. <br />3.4.1 Design-Builder shall obtain and pay for all necessary permits, approvals, licenses, <br />government charges and inspection fees for the Project, that are not required by law to be <br />obtained by Owner. <br />3.5 Owner’s Separate Contractors. <br />3.5.1 Owner is responsible for all work performed on the Project or at the Site by separate <br />contractors under Owner’s control. Owner shall contractually require its separate contractors to <br />cooperate with and coordinate their activities so as not to interfere with, Design-Builder to enable <br />Design-Builder to timely complete the Work consistent with the Contract Documents. <br /> <br /> <br />Article 4 <br />Hazardous Conditions and Differing Conditions <br />4.1 Hazardous Conditions. <br />4.1.1 Unless otherwise expressly provided in the Contract Documents to be part of the Work, <br />Design-Builder is not responsible for any Hazardous Conditions encountered at the Site. Upon <br />encountering any Hazardous Conditions, Design-Builder will stop Work immediately in the <br />affected area and duly notify Owner and, if required by Legal Requirements, all government or <br />quasi-government entities with jurisdiction over the Project or Site. <br />4.1.2 Upon receiving notice of the presence of suspected Hazardous Conditions, Owner shall <br />take the necessary measures required to ensure that the Hazardous Conditions are remediated or
The URL can be used to link to this page
Your browser does not support the video tag.