My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
25 <br />Progressive Design Build General Conditions <br /> <br />8.2 Delays to the Work. <br />8.2.1 If Design-Builder is delayed in the performance of the Work due to acts, omissions, <br />conditions, events, or circumstances beyond its control and due to no fault of its own or those for <br />whom Design-Builder is responsible, the Contract Time(s) for performance shall be reasonably <br />extended by Change Order. Delays attributable to and within the control of a Subcontractor or <br />supplier shall be deemed to be delays within the control of Design-Builder. By way of example, <br />events that may entitle Design-Builder to an extension of the Contract Time(s) include acts or <br />omissions of Owner or anyone under Owner’s control (including separate contractors), changes <br />in the Work, Differing Site Conditions, Hazardous Conditions, and Force Majeure Events. <br />Design-Builder shall make all reasonable efforts to prevent and mitigate the effects of any delay, <br />whether occasioned by an act of Force Majeure or otherwise. <br />8.2.2 Design-Builder is not entitled to a change in Contract Time unless the progress of the <br />Work on the critical path is delayed and completion of the Work within Contract Time is delayed. <br />A Request for a Change Order that includes a request for an adjustment in the Contract Time <br />shall be delivered to Owner in accordance with Article 9 herein and, in addition to any <br />requirements in Article 9, shall: <br />a. Include a clear explanation of how the event or conditions specifically impacted <br />the critical path and overall construction schedule and the amount of the <br />adjustment in Contract Time requested. <br />b. Demonstrate that the delay could not have been avoided by re-sequencing of the <br />Work or other reasonable alternatives. <br />c. Be limited to the change in the critical path of a construction schedule, and any <br />updates, attributable to the event or conditions which caused the request for <br />adjustment. <br />8.3 In addition to Design-Builder’s right to a time extension for those events set forth in <br />Section 8.2.1 above, Design-Builder may also be entitled to an appropriate adjustment of the <br />GMP; except that the GMP shall not be adjusted for Force Majeure Events. <br /> <br />Article 9 <br />Changes to the GMP and Contract Time <br />9.1 Authorized Changes in the Work <br />9.1.1 General. After execution of the Contract, Changes in the Work are effective solely by <br />Change Order or Work Change Directive. <br />9.1.2 Change Order. A Change Order is a written instrument issued after execution of the <br />Contract signed by Owner and Design-Builder, stating their agreement upon all of the following: <br />9.1.2.1 The scope of the change in the Work; <br />9.1.2.2 The amount of the adjustment to the GMP, if any; and <br />9.1.2.3 The extent of the adjustment to the Contract Time(s), if any. <br />A Change Order shall constitute full payment and final settlement of all Claims for Contract Time <br />adjustment and for direct, indirect, and consequential costs, including costs of delays,
The URL can be used to link to this page
Your browser does not support the video tag.