My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />3.0 SPECTATOR FACILITIES <br />Class <br />No.Space Type Units SF Total SF Description USL MiLB <br />3.1 SUITES & CLUBS 0 <br />3.1.1 Suites <br />3.1.1.a Season-Long 0 300 0 Premium location for both MiLB and USL (4 suites @ 12 seats each) <br />3.1.1.b Field / Pitch-side Suites 0 300 0 Locate on field, quantity and SF is TBD. <br />3.1.1.c City Use 0 300 0 Locate on Press/Suite Level. <br />3.1.1.d Double Wide 0 300 0 Two suites that can be converted into one large suite <br />3.1.2 Suite Lounge 0 120 0 Gathering areas along Suite Concourse. <br />3.1.3 Indoor Stadium Club 0 20 0 Indoor Club area (sized for 200 club seats @ 15 sf/person). --- Banquet for 200 <br />3.1.4 Outdoor Stadium Club 0 20 0 Outdoor Club area / Party Deck. Can be converted to future suites. <br />3.2 GROUP SALES AREAS 0 <br />3.2.1 Picnic Areas <br />3.2.2 Group Area (SRO) - Concourse 0 15 0 Area accommodating +/- 500 people each. Near Group Seating. <br />3.3 PUBLIC TOILETS 0 <br />3.3.1 Toilets - Lower Deck + Loge Box + Bleachers + Berms + Picnic + SRO <br />3.3.1.a Women's Toilet (Fixtures)0 50 0 Total Fixtures = Water Closets + Lavatories <br /> Water Closets 0 Prelim Count for general seating (3,000) areas based upon 2021 IBC . <br /> Lavatories 0 Prelim Count for general seating (3,000) areas based upon 2021 IBC . <br />3.3.1.b Men's Toilet (Fixtures)0 50 0 Total Fixtures = Urinals +Water Closets + Lavatories <br /> Toilets 0 Prelim Count for general seating (3,000) areas based upon 2021 IBC . <br /> Urinals 0 2/3 of total Toilet Count <br /> Water Closets 0 1/3 of total Toilet Count <br /> Lavatories 0 Prelim Count for general seating (3,000) areas based upon 2021 IBC . <br />3.3.1.c Family Toilet 0 80 0 Provide 1 water closet, 1 lav in each. Locate one each on 1st and 3rd base sides. <br />3.3.1.d Custodial / Storage Closet 0 50 0 One closet per pair of men & women toilet rooms. <br />3.3.2 <br />3.3.2.a Women's Toilet (Fixtures)0 50 0 Total Fixtures = Water Closets + Lavatories <br /> Water Closets 0 Prelim Count for general seating areas based upon 2021 IBC . <br /> Lavatories 0 Prelim Count for general seating areas based upon 2021 IBC . <br />3.3.2.b Men's Toilet (Fixtures)0 50 0 Total Fixtures = Urinals +Water Closets + Lavatories <br /> Toilets 0 Prelim Count for general seating areas based upon 2021 IBC . <br /> Urinals 0 2/3 of total Toilet Count <br /> Water Closets 0 1/3 of total Toilet Count <br /> Lavatories 0 Prelim Count for general seating areas based upon 2021 IBC . <br />3.3.2.c Family Toilet 0 80 0 Provide 1 water closet, 1 lav. <br />3.3.2.d Custodial / Storage Closet 0 50 0 One closet per pair of men & women toilet rooms. <br />3.3.3 <br />3.3.3.a Women's Toilet (Fixtures)50 0 Total Fixtures = Water Closets + Lavatories <br /> Water Closets Prelim Count for general seating areas based upon 2021 IBC. <br /> Lavatories Prelim Count for general seating areas based upon 2021 IBC . <br />3.3.3.b Men's Toilet (Fixtures)50 0 Total Fixtures = Urinals +Water Closets + Lavatories <br /> Toilets Prelim Count for general seating areas based upon 2021 IBC . <br /> Urinals 2/3 of total Toilet Count <br /> Water Closets 0 1/3 of total Toilet Count <br /> Lavatories Prelim Count for general seating areas based upon 2021 IBC . <br />3.3.3.c Family Toilet 80 0 Provide 1 water closet, 1 lav in each. <br />3.3.3.d Custodial / Storage Closet 50 0 One closet per pair of men & women toilet rooms. <br />3.4 GUEST SERVICES 0 <br />3.4.1 Guest Services/Marketing 0 120 0 Locate in highly visible location on Main Concourse. <br />3.4.2 First Aid 0 200 0 Locate on Main Concourse. Includes RR. Near Guest Services <br />3.4.3 Security Office @ Maint Area 0 140 0 Command post for game-day security. No Holding Room. <br />3.4.4 ATM 0 Locate on concourse--one each along 1st and 3rd base sides. <br />3.4.5 Public Telephones 0 Locate on concourse--two each along 1st and 3rd base sides. <br />3.4.6 Mothers' Room 0 150 0 Locate near Guest Services <br />3.4.7 Family RR 0 65 0 Locate near Guest Services <br />3.5 MISCELLANEOUS PUBLIC AREAS 0 <br />3.5.1 Outdoor Bar 0 0 0 Large area with view of field. Provide area for tables, stage, etc. <br />3.5.2 Kid's Play Area 0 5,000 0 One (1) large area with view of field. Provide area for the following: <br />- Play equipment, slab for carousel, wiffleball field <br />3.6 CIRCULATION 0 <br />3.6.1 Concourses <br />3.6.1.a Main Concourse 0 5 0 Open concourse with view of field as much as possible. <br />3.6.1.b Suite Corridor 0 6 0 Circulation between lobby, suites, restrooms, pantry, storage, etc. <br />3.6.2 Elevator Lobbies <br />3.6.2.a Public Elevator Lobby 0 250 0 Assume at three (3) levels - Locker, Concourse, Suite/Press. <br />3.6.2.b Service Elevator Lobby 0 250 0 Assume at three (3) levels - Locker, Concourse, Suite/Press. <br />3.6.2.c Team Offices Elevator Lobby 0 250 0 Assume at three (3) levels - Concourse, 2nd Floor Team Offices, Roof Top <br />3.6.3 Vertical Circulation <br />3.6.3.a Ramps 0 0 0 <br />3.6.3.b Stairs 0 480 0 Assume at three (3) levels - Field, Concourse, Suite/Press. <br />3.6.3.c Elevators - Public 0 100 0 Assume at three (3) levels - Field, Concourse, Suite/Press. <br />3.6.3.d Elevators - Service 0 100 0 Assume at three (3) levels - Field, Concourse, Suite/Press. <br />Total - Enclosed Areas 0 NSF <br /> Net to gross 15%0 SF <br />Total - Outdoor Areas 0 SF <br />TOTAL 0 GSF <br />Toilets - Suites + Stadium Club <br />3/6/2025 Page 2 of 7 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program
The URL can be used to link to this page
Your browser does not support the video tag.