Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4 <br />Progressive Design Build Contract <br /> <br />2.3.1.4 The Scheduled Substantial Completion Date upon which the Phase 2 Proposal is <br />based, to the extent said date has not already been established under Section 6.2.1 hereof, <br />and a schedule upon which the Scheduled Substantial Completion Date is based and a <br />Project Schedule for the Work; <br /> <br />2.3.1.5 If applicable, a list of Allowance Items, Allowance Values, and a statement of their <br />basis; <br /> <br />2.3.1.6 If applicable, a schedule of alternate prices; <br /> <br />2.3.1.7 If applicable, a schedule of unit prices; <br /> <br />2.3.1.8 If applicable, a statement of Additional Services which may be performed but which <br />are not included in the Phase 2 Proposal, and which, if performed, shall be the basis for an <br />increase in the GMP and/or Contract Time(s); <br /> <br />2.3.1.9 An expiration date for the Phase 2 Proposal provided that Design-Builder shall not <br />make the Phase 2 Proposal subject to expiration or withdrawal for at least ninety (90) days <br />after submission and Owner shall provide its initial review and comment on the Phase 2 <br />Proposal within thirty (30) days of submission; <br /> <br />2.3.1.10 A Permits and Approvals list detailing the permits and governmental approvals not <br />otherwise addressed in the Contract Documents that Owner and Design-Builder will need <br />and assigning responsibility for each; <br /> <br />2.3.1.11 A preliminary training plan; <br /> <br />2.3.1.12 A Project Specific Safety Plan; <br /> <br />2.3.1.13 A construction quality plan. <br /> <br />2.3.1.14 A plan for inclusion of underutilized firms as subcontractors and suppliers in <br />accordance with the provisions of Chapter 39.10 RCW, the requirements of the Office of <br />Minority and Women’s Business Enterprises (“OMWBE”), any other Owner-required <br />inclusion requirements, and, if the Project is subject to Project Labor <br />Agreement/Community Workforce Agreement, in accordance with that Project Labor <br />Agreement/Community Workforce Agreement. <br /> <br />2.3.1.15 Design-Builder’s Owned Equipment Rate Schedule, which shall be incorporated <br />herein as Exhibit E and shall include adequate identifying information such as use, <br />manufacturer, make, model, dimensions/length, blade size, capacity, fuel usage, horse <br />power, voltage/amperage, weight, etc., such that accurate identification can be <br />determined. These descriptors shall match Contractor’s owned equipment rental log. <br />Exhibit E shall include replacement values and approved rates for each item. <br /> <br />2.3.2 Review and Adjustment to Phase 2 Proposal. <br /> <br />2.3.2.1 After submission of the Phase 2 Proposal, Design-Builder will discuss and review <br />it with Owner. Owner may require modifications to the Phase 2 Proposal that Design- <br />Builder shall in good faith attempt to accommodate. Owner must approve the Phase 2 <br />Proposal, as originally submitted or as modified, and enter into a GMP Amendment <br />incorporating the agreed Phase 2 Proposal in order for the Design-Builder to proceed to <br />Phase 2. <br /> <br />2.3.2.2 Acceptance of Phase 2 Proposal. If Owner accepts the Phase 2 Proposal, as <br />may be modified, the Contract Price and its basis shall be set forth in an amendment to