My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />May 8, 2025 <br /> <br />Ehan Bernau, Partner & Sr. Project Manager <br />Shiels|Obletz|Johnsen <br />1109 1st Ave, Suite 330 <br />Seattle, WA 98101 <br /> <br />SUBJECT: Phase 1A Work & Fee Proposal – Everett Outdoor Event Center <br />Dear Ethan, <br />Please find attached the Phase 1A Work and Fee Proposal from Bayley Construction and <br />DLR Group for the Schematic Design through Design Development package for the Everett <br />Outdoor Event Center, as part of the progressive design-build delivery method. <br />This proposal has been developed based on an anticipated Phase 2 Work construction <br />budget of $42,000,000, which serves as the basis for our design fee calculations. The total <br />proposed cost for Phase 1A is $2,901,602.40, excluding Washington State Sales Tax <br />(W.S.S.T.), and includes a 3% design contingency and a $25,000 allowance for <br />geotechnical services. A detailed cost summary is enclosed for your review. <br />We understand that this proposal will be incorporated into your submittal to the City of <br />Everett for consideration by the City Council in May and early June. Pending Council review <br />and approval, we anticipate receiving authorization to proceed following the scheduled <br />meeting on June 11, 2025. Our team is prepared to complete the Phase 1A scope of work <br />by the first week of September 2025. <br />Please note that this proposal excludes any additional services or costs associated with <br />extending the Phase 1A work beyond the September completion date, provided that any <br />delays are not attributable to Bayley Construction, DLR Group, or our consultants. <br />We appreciate the opportunity to support this exciting project and look forward to <br />continuing our partnership with the City of Everett and your team. <br /> <br /> <br /> <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.