Laserfiche WebLink
<br />EXHIBIT C <br />TO <br />PROGRESSIVE DESIGN-BUILD CONTRACT <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />The fee proposals from subconsultants (such as DLR Group, RDH, KPFF, Headwater People, DA <br />Hogan, WJHW, JMI, Cochran, Coffman Engineers, Red Hawk, Harmsen, and GeoEngineers) are <br />included to identify the members of Design-Builder’s team and to show the allocation of Phase 1A <br />work. General conditions and other proposed contractual terms and conditions in those <br />subconsultant proposals are not part of the Contract between Design-Builder and the City.