Laserfiche WebLink
Exhibit C - Phase 1A Work & Fee Proposal <br />Everett Multipurpose Stadium <br />Bayley+DLR Group Design Cost to GMP (Phase 1A SD thru DD & Phase1B Final Design) <br />8-May-25 <br />Designer Phase 1A - SD thru DD Phase 1B - Final Design Comments/Notes <br />Initial NTP ($200K)200,000.00$ <br />DLR Group 1,730,959.00$ 2,115,617.00$ <br /> - Expenses (estimate)54,234.00$ 96,312.00$ <br />Midwest Design Travel -$ 100,000.00$ Not to Exceed - Handled T&M <br />Structural Design Inc. DLR Group -$ -$ <br />Civil Design (KPFF)Inc. DLR Group -$ -$ <br />Mechanical Design (Johansen/DLR Group)248,409.00$ 295,833.00$ <br />Electrical Design (Coffman)160,179.00$ 232,434.00$ <br />Red Hawk Fire 34,446.00$ 30,606.00$ Design & Permit Cost - Phase 1A <br />Bayley Construction 331,748.00$ 126,075.00$ Phase 1B is to Start of Construction <br />Bayley Construction - Join Software -$ 20,000.00$ <br />Purchased in Phase 1A, but deferred <br />billing to Phase 1B <br />Bayley Construction- ProCore -$ 105,000.00$ Part of GC/GR's in Construction <br />Survey (Harmson)74,235.00$ -$ <br />Geo Tech (GeoEngineers)92,054.47$ -$ <br /> - Geo Tech - Contingency 25,000.00$ -$ <br />Hazardous Materials Report & Testing (Rich Carlson)60,000.00$ 30,000.00$ <br />Summary 3,011,264.47$ 3,151,877.00$ <br />Design Contingency 3%90,337.93$ 94,556.31$ <br />We may use $25K for Food Service <br />Allowance and $15K for renderings in <br />future <br />-$ -$ <br />-$ -$ <br />Sub Total 3,101,602.40$ 3,151,877.00$ <br />Initial NTP Proposal (200,000.00)$ <br />Total 2,901,602.40$ <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal