My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />DLR Group inc. <br />a Washington corporation <br />51 University Street, Suite 600 <br />Seattle, WA 98101 <br /> <br /> <br /> <br />May 6, 2025 <br /> <br /> <br />Stewart Potter <br />Bayley Construction <br />8005 SE 28th Street <br />Mercer Island, WA 98040 <br /> <br />Re: Project Name: Everett Outdoor Event Center <br />DLR Group Project No.: 73-25119-00 <br /> <br />Dear Stewart: <br /> <br />We have refined and expanded our fee proposal that was provided in February based on the programming, <br />budget estimates, and advanced research for the Everett Outdoor Event Center. This revised fee proposal is <br />based on the Cost of the Phase 2 Work of $42,000,000. Please note that most of the estimate fees for each <br />scope of work is a percentage derived from the construction budget above. If the Guaranteed Maximum Price <br />(GMP) is approved at a higher budget or additional funding is procured, we will request and Additional Service <br />for the deviation to accompany the project of higher scope. <br /> <br />It is our understanding this fee proposal will be included in your proposal to the City of Everett for review by the <br />City Council in mid-May. We anticipate authorization to proceed following that meeting for a schematic design <br />kick off the week of June 2, 2025. If this schedule is modified, there may be a requirement for additional <br />services as well because of any follow up work that may be requested to achieve notice to proceed. When this <br />proposal is accepted, we will be invoicing for the work completed t hat is above and beyond the stipend <br />provided. <br /> <br />This is a list of modifications that were made to the proposal for your review. This narrative can assist in <br />evaluating a line by line review as necessary. <br /> <br />1. Proposals have been received by all but one design consultant (see below). The consultant <br />proposals are attached to this memo to confirm fees. Some have gone up and down with the <br />refined level of detail that we can provide. <br />2. Basic services fee percentage has been revised to 5.68% of the MACC. This was accomplished for <br />three reasons: <br />a. Architectural / Interiors / Project Management was reviewed based on the timeline set for <br />design to provide the construction schedule required. For this context, we can expedite <br />some services and limit the budget to 4% in lieu of 5.05%. This is considered an efficiency <br />to the design services and how we will operate. <br />b. Civil Basic Services in the WA State Fee Schedule is a portion of the civil design that <br />includes the typical items that every building regardless of complexity would require such <br />as connection to utilities, general grading, etc. This is equal to 20% of the total civil design <br />fee. This has been revised and reduced the basic services. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.