My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Outdoor Event CenterCity of EverettMay 6, 2025Fee Proposal Calculation R3DLR Group # 73-25119-00CONSTRUCTION COST LIMITATION$42,000,000We understand the baseline to be $55M GMP which estimates a $42M Construction Cost. Once scope/budget are finalized, fee will be revisited and adjusted accordingly. % of CCLFee AmountCommentsConsultantAIA BASIC SERVICESArchitectural / Interiors / Project Management 4.00% $1,680,000.00 Changed percentage from Original Draft DLR GroupCivil 0.38% $157,600.00 Basic Service for Civil Engineering KPFFStructural 1.00% $420,000.00Proposal modified. Reduced $105,000DLR GroupMEP 0.00% Through Sub-TradeAdministrative 0.05% $21,000.00 DLR GroupSubtotal - Basic Services 5.43% $2,278,600.00ADDITIONAL SERVICESProgramming $150,000 PD DLR GroupLandscape Architecture $42,000*Estimate. Scope TBDWalker | MacyAdvanced Civil Design $630,400 For Specific Engineering of this site KPFFIT/Low Voltage Systems/Security; Acoustics/ AV $185,196Proposal modified. Reduced $16,104WJHWField Design Consultant $125,000Proposal receivedDA HoganSignage/Wayfinding $79,500Proposal modified. Reduced $26,500DLR Group XGDLEED - leadership and documentation, Silver $49,950Proposal receivedDLR GroupClimate Strategy/Energy Modeling $77,000Proposal modified. Reduced $2,500DLR GroupFundamental Commissioning $47,720Proposal modified. Reduced $2,680 DLR Group through Johansen?Enhanced Commissioning $35,080Proposal receivedDLR Group through Johansen?Life Safety/Fire Protection/Code Consultant $40,000Proposal receivedFSCBuilding Envelope Consultant $25,000Proposal receivedRDHCommunity Input Consultant $21,500Proposal receivedHeadwater People, incl reimbursablesFood Service $0 TBD TBDSubtotal - Additional/Contingent Services $1,508,346Subtotal consulant only fee $596,296DLR Group Consultant Markup 10.00% $59,630Subtotal - Additional/Contingent Services with markup $1,567,976TOTAL FEES$3,846,576DLR Group 1 Everett Multipurpose Outdoor Stadium Design-Build Contract for Everett Outdoor Events CenterExhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.