My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Estimate, if knownAccelerated Design Art CoordinationAs-builtsCost Estimating BayleyCurtainwall ConsultantEnvironmental Graphics $66,000Proposal receivedDLR Group XGD Environmental Survey/AnalysisExisting Conditions survey or documentationField Lighting Consultant Musco or Ephesus - Through CochranFurniture Fixtures and Equipment $21,000 DLR Group InteriorsGeotechnical Investigation and ReportLEED Submission and Certification $6,000Proposal receivedOff-site design work- utilities, civil, MEP, or ITPhysical model or outsourced renderings $5,000 Per rendering Red VertexSoils conditions requiring special structuralStormwater QualityStructural Special InspectionsSurvey Harmsen (under Bayley)Threat Assessment TrafficVibration Analysis Voice/Data wire and equipREIMBURSABLE EXPENSESReview/Milestone Printing $0 Bayley or not requiredCity Civil plan review and permit fee $0 By OwnerTypical Reimbursables 2.00% $76,932Utility reservation letters, ROW plan fees $0 By OwnerAccessibility check $0 By OwnerPlan review fees - City right-of-way $0 By OwnerSubtotal - Reimbursable Expenses (non out of state travel) $76,932Out of State Travel - DLR Group only $100,000 Not to exceed reimbursablesEXCLUDED, OPTIONAL ADDITIONAL SERVICES DLR Group 2 Everett Multipurpose Outdoor Stadium Design-Build Contract for Everett Outdoor Events CenterExhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.