My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Estimate, if knownAccelerated Design Art CoordinationAs-builtsCost Estimating BayleyCurtainwall ConsultantEnvironmental Graphics $66,000Proposal receivedDLR Group XGD Environmental Survey/AnalysisExisting Conditions survey or documentationField Lighting Consultant Musco or Ephesus - Through CochranFurniture Fixtures and Equipment $21,000 DLR Group InteriorsGeotechnical Investigation and ReportLEED Submission and Certification $6,000Proposal receivedOff-site design work- utilities, civil, MEP, or ITPhysical model or outsourced renderings $5,000 Per rendering Red VertexSoils conditions requiring special structuralStormwater QualityStructural Special InspectionsSurvey Harmsen (under Bayley)Threat Assessment TrafficVibration Analysis Voice/Data wire and equipREIMBURSABLE EXPENSESReview/Milestone Printing $0 Bayley or not requiredCity Civil plan review and permit fee $0 By OwnerTypical Reimbursables 2.00% $76,932Utility reservation letters, ROW plan fees $0 By OwnerAccessibility check $0 By OwnerPlan review fees - City right-of-way $0 By OwnerSubtotal - Reimbursable Expenses (non out of state travel) $76,932Out of State Travel - DLR Group only $100,000 Not to exceed reimbursablesEXCLUDED, OPTIONAL ADDITIONAL SERVICES DLR Group 2 Everett Multipurpose Outdoor Stadium Design-Build Contract for Everett Outdoor Events CenterExhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.