My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
31847_000 2025 04 15 MK LTR Proposal for Building Enclosure Consulting Services Page 1 TO DLR Group, Inc. 31847.000 Everett Multi- Purpose Stadium C/O Andy West EMAIL awest@dlrgroup.com DLR Group, Inc. 1128 Lincoln Mall, Ste. 103 Lincoln, NE 68508 DATE April 15, 2025 REGARDING Proposal for Building Enclosure Consulting Services Dear Andy West, As requested, RDH Building Science Inc. (RDH) is pleased to provide you with this proposal <br />for building enclosure consulting services for the p roject known as the Everett Multi- <br />Purpose Stadium, located in Everett, Washington. Thank you for requesting this proposal. <br />The project consists of development of a full-servic e multi-purpose athletic field, training <br />facility, and appurtenant retail, hospitality, and co ncession facilities. We understand the project is being developed using a progressive design-build model in partnership with Bayley Construction LP. Scope Background We offer three levels of services: Building Enclosur e Design, Design Assist, and Design Peer Review. Based on our correspondence and discussions we have written the rest of <br />this proposal assuming the last option, Design Peer Review. Building Enclosure Design Peer Review In this role, we provide recommendations on building enclosure assemblies and details on <br />an as-requested basis and at predetermined milestones . Our recommendations are usually provided through electronic mark-up and review as well as through other informal <br />correspondence as requested. Our project involvement and scope is at your discretion and, therefore, we bill on an hourly basis. Scope of Work Our scope of services pertains to all assemblies tha t separate interior environments from exterior environments. Design Peer Review We will review for thermal, air, vapor, and water-res istant barrier (drainage plane) <br />continuity design documents that you provide us and attend follow-up meetings with you <br />as necessary to discuss our comments. We understand th at the DLR/Bayley team desires <br />building enclosure design review at the following pr oject stages: Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.