My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
31847_000 2025 04 15 MK LTR Proposal for Building Enclosure Consulting Services Page 2 Phase I Kickoff Meeting Attendance Address any building enclosure inquiries during the DD phase DD/GMP QAQC Review (Bluebeam session) Phase II Address any building enclosure inquiries during the CD phase CD QAQC Review (Bluebeam Session) CA Support (RFIs and inquiries) Although our comments may provide some limited desig n modification suggestions, we <br />are not the Designer of Record, and others must evalu ate the relevance of our comments to the actual design intent. The primary focus of our commentary will be to address <br />design matters that we feel present excessive risk a nd in some cases to provide <br />suggestions for design modifications that may reduce th at risk. Our review excludes the following: Dimensional coordination between architectural and stru ctural drawings Review of sole source items Review of hidden cost implications Commentary on lead times that may result in delay Our review comments will be provided in the form of electronic red-line mark-ups made <br />directly on the drawings and supplemented with additio nal or clarifying comments in <br />memorandum form. Our commentary will focus on review of moisture control strategies, <br />general assemblies, detailing, and industry practice. We also assume reviewing the relevant project specific ation sections. Our specification <br />review is limited to Part 2 for materials only; we do not crosscheck references and do not compare Part 3 methodologies with manufacturers' requ ired installation methods. Our <br />specification review will be included in the memorandum. Our scope does not include drafting or hand-drawn de sign of any conditions but may <br />provide concept sketches or similar typical detail su ggestions as we see fit. Construction Phase As requested, this proposal includes a time and expense budget for construction <br />administration support to be engaged at the team’s di scretion. The following are <br />construction phase activities in which RDH staff are typically engaged: Pre-Installation Meetings We are available to attend pre-installation meetings wi th the design team and the General Contractor and subcontractors. Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.