Laserfiche WebLink
31847_000 2025 04 15 MK LTR Proposal for Building Enclosure Consulting Services Page 3 Submittal and Shop Drawing Review: We can assist in reviewing submittals and shop drawings for enclosure assemblies. RFI/ASI Review: Provide support reviewing and responding to contractor Requests for Information (RFI) <br />and Architect Supplemental Instructions (ASI). Mock-Up Review: Participate in mock-up coordination and review on-si te. Construction Phase – Optional Services Water Testing RDH has all of the equipment and trained skilled staf f necessary to perform water <br />penetration (and/or air leakage) performance testing of glazing systems and assemblies. <br />Each water test would be followed with a water penetr ation testing report. We have not <br />included a budget for these services at this time but can do so upon your request. Whole-Building Air Leakage Testing As part of energy code compliance, this project may require whole-building air leakage tests for occupied/enclosed areas. RDH has the equip ment and skilled staffing to perform whole-building air leakage testing. We can provide a separate scope and fee proposal for these services at your request. Fees and Terms of Agreement FEE SUMMARY TABLE DESIGN PEER REVIEW Base Scope OptionalDesign Peer Review (Time and Expense Allowance) 17,000$ Design Peer Review Subtotal 17,000 $ CONSTRUCTION STAGE Construction Admin. Support (T&E Allowance) 8,000$ CAS Subtotal 8,000 $ CONSTRUCTION STAGE - OPTIONAL SERVICESWater Testing TBDWhole-Building Air Leakage Testing TBDTOTAL 25,000 $ Expenses Though we do not anticipate any expenses, if they ar e incurred, for site visits for <br />example, we bill expenses at actual cost plus 10%. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal