My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 kpff.com <br /> <br />April 8, 2025 <br /> <br /> <br /> <br />Mr. Andy West, AIA <br />DLR Group <br />51 University Street, Suite 600 <br />Seattle, WA 98101 <br /> <br />Subject: Everett Outdoor Multipurpose Stadium <br /> Proposal for Civil Engineering Services – Phase 1 Contract <br /> Schematic Design – Design Development (GMP) <br /> <br />Dear Andy: <br /> <br />We are pleased to submit this proposal to provide civil engineering services for the Everett <br />Outdoor Multipurpose Stadium project in Everett, Washington. Our scope of work is based on <br />discussions with you and the “green” option picked by the City of Everett during the meeting on <br />March 27, 2025. <br /> <br />PROJECT DESCRIPTION <br /> <br />We understand the “green” option was selected by the City of Everett. The stadium will sit at <br />the southwest corner of the site, refer to the attached exhibit. Parcels 1 through 15 will be <br />purchased by the city to accommodate the new stadium development. Parcels 27 and 28 <br />may be acquired depending on the need for site laydown space and final test fits during <br />schematic design. Utility reroutes include the large 60-inch combined sewer, 6-inch water <br />main and SnoPUD electrical service. <br /> <br />SCHEDULE <br /> <br />We understand the project schedule is as follows: <br />Schematic Design 1/1/2025 – 4/28/2025 <br />Design Development/GMP 4/28/2025 – 9/8/2025 <br />If the Phase 1 schedule extends beyond the dates identified above, we request the <br />opportunity to renegotiate our phase 1 fee to cover the additional time and effort. <br /> <br /> <br /> <br /> <br /> DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.