My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Andy West <br />April 8, 2025 <br />Page 2 <br /> <br /> <br /> <br />SCOPE OF WORK <br /> <br />SCHEMATIC DESIGN <br /> <br />Schematic design deliverable will consist of a civil engineering systems narrative. The civil <br />narrative section will cover the following items: <br />· Site Description <br />· Applicable Codes <br />· Site Demolition <br />· Construction Stormwater <br />· Vehicular site circulation <br />· Mass Grading <br />· Proposed Utilities <br />· Existing Utility Reroutes <br />· Storm Drainage Mitigation <br /> <br />We will also attend weekly coordination meetings with the design build team and explore <br />options for site layout with DLR. <br /> <br />DESIGN DEVELOPMENT/GMP <br /> <br />We will prepare civil engineering plans and draft technical specifications for the design-build <br />team to use in developing a Guaranteed Maximum Price (GMP) for the City of Everett. We <br />recommend an early site demolition permit set will be prepared during DD to facilitate site <br />preparation construction activities. Refer to the table below for anticipated the DD/GMP <br />deliverables. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.