My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Andy West <br />April 8, 2025 <br />Page 2 <br /> <br /> <br /> <br />SCOPE OF WORK <br /> <br />SCHEMATIC DESIGN <br /> <br />Schematic design deliverable will consist of a civil engineering systems narrative. The civil <br />narrative section will cover the following items: <br />· Site Description <br />· Applicable Codes <br />· Site Demolition <br />· Construction Stormwater <br />· Vehicular site circulation <br />· Mass Grading <br />· Proposed Utilities <br />· Existing Utility Reroutes <br />· Storm Drainage Mitigation <br /> <br />We will also attend weekly coordination meetings with the design build team and explore <br />options for site layout with DLR. <br /> <br />DESIGN DEVELOPMENT/GMP <br /> <br />We will prepare civil engineering plans and draft technical specifications for the design-build <br />team to use in developing a Guaranteed Maximum Price (GMP) for the City of Everett. We <br />recommend an early site demolition permit set will be prepared during DD to facilitate site <br />preparation construction activities. Refer to the table below for anticipated the DD/GMP <br />deliverables. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.