Laserfiche WebLink
Mr. Andy West <br />April 8, 2025 <br />Page 6 <br /> <br /> <br /> <br />FEES <br /> <br />We will provide the above civil engineering services for the following lump sum fees. <br /> <br />Schematic Design $ 43,800 <br />Design Development/GMP 338,200 <br /> <br />Total Phase 1 Fee $ 382,000 <br /> <br />Thank you for this opportunity to serve DLR Group. If you have any questions concerning this <br />proposal, please feel free to call me at (206) 622-5822. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Joss Gramstad, PE <br />Associate <br /> <br />JCG:heh <br /> <br />Enclosure <br /> <br />1900684 – 20 DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal