My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Andy West <br />April 8, 2025 <br />Page 5 <br /> <br /> <br /> <br />o Light pole layout to KPFF for use in civil drawings for coordination with site <br />utilities. <br />· A 50-stall player and staff parking lot will be included with the base bid. Additional <br />parking requirements will be explored during the SD phase. <br />· DLR will design and document all grading over and within the structure. KPFF will <br />document grading outside the stadium structure. <br />· KPFF will design and document all vehicular and pedestrian pavement sections with <br />input from the Geotechnical Engineer. Any specialty finish or jointing would be by the <br />landscape architect. <br />· A specialty sports field consultant will design and document all elements of the proposed <br />sports field including material, grading, striping, and drainage. <br />· The proposed development will not result in an increase to the existing impervious <br />surface area, therefore, flow control is not required. <br />· Water quality treatment will not be required because the site discharges to a combined <br />sewer system. <br />· KPFF will prepare off-site street improvement plans in compliance with City Standards. <br />The project landscape architect will provide landscape, irrigation, and non-standard <br />sidewalk design. <br />· KPFF will not be providing a Revit BIM model of site improvements or utilities. KPFF will <br />provide a digital terrain model of the site grading and utility profiles in Civil3D for <br />inclusion into the project BIM model. <br />· Structural design for site walls, planters, light pole bases, and vaults is by DLR structural <br />team. <br />· KPFF will prepare a SWPPP and assist Bayley with the Notice of Intent (NOI) to obtain <br />coverage under the Department of Ecology (DOE) NPDES permit. The permit will be <br />held by Bayley. <br /> <br />EXCLUSIONS <br /> <br />· Demolition documentation for electrical infrastructure, partial/full building demolition, and <br />hazardous materials. <br />· Lift station (pump) design (not anticipated). <br />· Horizontal control for the proposed building (by DLR). <br />· Turbidity Monitoring Plan. <br />· Temporary or permanent dewatering design (by others). <br />· Cost estimating (by Bayley) <br />· Boundary Line Adjustment (BLA) and Easements (by the surveyor) DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.