Laserfiche WebLink
Mr. Andy West <br />April 8, 2025 <br />Page 5 <br /> <br /> <br /> <br />o Light pole layout to KPFF for use in civil drawings for coordination with site <br />utilities. <br />· A 50-stall player and staff parking lot will be included with the base bid. Additional <br />parking requirements will be explored during the SD phase. <br />· DLR will design and document all grading over and within the structure. KPFF will <br />document grading outside the stadium structure. <br />· KPFF will design and document all vehicular and pedestrian pavement sections with <br />input from the Geotechnical Engineer. Any specialty finish or jointing would be by the <br />landscape architect. <br />· A specialty sports field consultant will design and document all elements of the proposed <br />sports field including material, grading, striping, and drainage. <br />· The proposed development will not result in an increase to the existing impervious <br />surface area, therefore, flow control is not required. <br />· Water quality treatment will not be required because the site discharges to a combined <br />sewer system. <br />· KPFF will prepare off-site street improvement plans in compliance with City Standards. <br />The project landscape architect will provide landscape, irrigation, and non-standard <br />sidewalk design. <br />· KPFF will not be providing a Revit BIM model of site improvements or utilities. KPFF will <br />provide a digital terrain model of the site grading and utility profiles in Civil3D for <br />inclusion into the project BIM model. <br />· Structural design for site walls, planters, light pole bases, and vaults is by DLR structural <br />team. <br />· KPFF will prepare a SWPPP and assist Bayley with the Notice of Intent (NOI) to obtain <br />coverage under the Department of Ecology (DOE) NPDES permit. The permit will be <br />held by Bayley. <br /> <br />EXCLUSIONS <br /> <br />· Demolition documentation for electrical infrastructure, partial/full building demolition, and <br />hazardous materials. <br />· Lift station (pump) design (not anticipated). <br />· Horizontal control for the proposed building (by DLR). <br />· Turbidity Monitoring Plan. <br />· Temporary or permanent dewatering design (by others). <br />· Cost estimating (by Bayley) <br />· Boundary Line Adjustment (BLA) and Easements (by the surveyor) DRAFTDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal