Page 5 <br /> <br /> <br />LEED BD+C: New Construction - Fundamental Commissioning and Verification Fee <br />EA Prerequisite - Fundamental Commissioning $47,720.00 <br /> <br />LEED Fundamental Cx: Phase I $19,480.00 <br />LEED Fundamental Cx: Phase II $28,240.00 <br />Total Fundamental Commissioning Fee (Required) $ 47,720.00 <br /> <br />LEED BD+C: New Construction - Enhanced Commissioning Fee <br />Option 1. Enhanced Systems Commissioning (3-4 points) <br />Path 1: Enhanced Commissioning (3 points) $35,080.00 <br />Path 2: Enhanced and Monitoring-Based Commissioning (4 points) $9,560.00 <br />Option 2. Building Enclosure Commissioning (2 points) $32,500.00 <br /> <br />LEED Enhanced Cx: Phase I $16,350.00 <br />LEED Enhanced Cx: Phase II $60,790.00 <br />Total Enhanced Commissioning Fee (Optional) $77,140.00 <br /> <br /> Total Fee <br />Fundamental Commissioning Fee + Enhanced Commissioning Options - Phase 1 $35,830.00 <br />Fundamental Commissioning Fee + Enhanced Commissioning Options - Phase 2 $89,030.00 <br />Total Fundamental Commissioning Fee + Enhanced Commissioning Options $124,860.00 <br /> <br /> <br />Notes: <br />1. Pricing for additional Commissioning scope for other building systems not specifically required to be <br />commissioned per IECC 2021, including, but not limited to fire pumps, electronic safety and security <br />systems, emergency generators, site utility systems and vertical transportation can be included upon <br />request on a T&M basis at DLR Group’s standard hourly rates. <br />2. DLR Group has no contingency included for retesting equipment that has failed functional testing of <br />equipment. Upon receipt of a completed pre-functional checklist or a system-readiness letter from the <br />contractor, DLR Group shall functionally test the equipment. In the event that retesting is required due <br />to the systems not being ready for testing due to the contractor not being completed, then retesting <br />shall be completed on a ‘work order’ basis. It shall be the contractor’s responsibility to properly prepare <br />systems for testing and if a test fails, the contractor is solely responsible to bear the added cost for <br />retesting. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal <br />P1: $26,930 <br />P2: $55,870 <br />T: $82,800 <br />P1: $7,450 <br />P2: $27,630 <br />T: $35,080 <br />Required by WA Energy Code