My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Everett Outdoor Multipurpose Stadium <br />Professional Services Proposal <br />Page 1 of 4 <br /> <br /> <br />April 2, 2025 (v2) <br /> <br />Andrew S. West, AIA <br />DLR Group <br />via e‐mail awest@dlrgroup.com <br /> <br />Re: Everett Outdoor Multipurpose Stadium <br /> Professional Services Scope & Fee Proposal <br /> <br />Dear Andy, <br /> <br />D.A. Hogan & Associates is pleased to submit the following proposal for professional services for the design & <br />construction administration of a new Everett Stadium located in Everett, WA. D.A. Hogan & Associates, Inc. <br />proposes to serve as a Sub‐Consultant to DLR Group, responsible for coordinating all necessary work related to the <br />design and construction of the field level playing surfaces necessary for a successful project. <br /> <br />PROJECT UNDERSTANDING <br />The project will be as proposed by Bayley Construction. <br /> <br />DA Hogan & Associates proposes to coordinate with DLR and Bayley, along with associated design disciplines and <br />subcontractors as necessary to provide designs, plans, and specifications related to the field level playing surfaces <br />including field subgrade establishment and site grading, field subsurface drainage and connection to a conveyance <br />provided by others, layout of synthetic turf playing surfaces and other related, game‐related equipment and <br />furnishings, and water systems for field conditioning and washwater. We also propose to provide construction <br />administration support and construction quality control support for these areas. <br /> <br />Our proposed Scope of Services, Schedule A, and Fee Proposal, Schedule B, follow. <br /> <br />Certificates of Insurance and Confirmation of Coverage/Additional Insured will be forwarded directly to you from <br />our insurance carrier upon and concurrent with execution of a contract. Please do not hesitate to contact me if you <br />need further information. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Eric Gold ASLA, Principal <br />D.A. Hogan & Associates, Inc. <br /> <br />Attachments: <br />Schedule A Scope of Work <br />Schedule B Fee Proposal <br />Exhibit 1, Preliminary Site Plan <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.