My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Everett Outdoor Multipurpose Stadium <br />Professional Services Proposal <br />Page 2 of 4 <br /> <br />SCHEDULE A <br /> <br />Professional Engineering & Landscape Architecture Services <br />Everett Outdoor Multipurpose Stadium <br /> <br />SCOPE OF SERVICES <br /> <br />1.1 PHASE I – SCHEMATIC DESIGN <br /> <br />A. Generally, from the current concept, arrive at an approved Schematic Design, Coordinate Cost <br />Estimating, and identify any issues affecting Permitting Strategy. <br />B. Design Verification <br />Verify the existing preliminary plan as follows; <br />1. Receive and review the Site Topographic Survey and Geotechnical Report prepared by others. <br />2. Perform Site Analysis including topographic, utilities, and circulation to identify options for field <br />grading and drainage. <br />3. Verify Program Elements including field of play / markings, warm up areas, etc. <br />C. Preliminary Specification and Cost Estimating <br />1. Provide a detailed narrative establishing quality standards associated with the construction. <br />2. Coordinate minimum construction standards; Identify typical details and materials specifications <br />to be utilized in support of the Contractors cost estimating effort. <br />3. Develop and Facilitate a synthetic turf specification / product / brand selection process as <br />needed. <br /> <br />1.2 PHASE II –DESIGN DEVELOPMENT <br /> <br />A. Generally, advance the design effort through final approval of all proposed systems and materials, <br />continue technical review and value engineering processes, and coordinate further refinement of cost <br />proposals (100% Design Development). <br />B. Coordinate with other consultant team members regarding site layout, utilities, grading, and <br />drainage. <br />C. Preliminary design and drawing preparation including layout, grading, drainage, water systems for <br />field conditioning and washwater, edge transitions, imported field base materials, synthetic turf field <br />surfacing systems, and other site amenities as applicable. <br />D. Coordinate value engineering and technical review by the GC and Design Lead <br />E. Review and comment on Contractor GMP. <br />F. Consultation as requested. <br /> <br />1.3 PHASE III – FINAL DESIGN PHASE / CONSTRUCTION DOCUMENTS <br /> <br />A. Generally, conclude all design production (100% Construction Documents). <br />B. Final documentation of all included systems and components. <br />C. Final working drawings and construction details including layout, grading, drainage, water systems for <br />field conditioning and washwater, edge transitions, imported field base materials, synthetic turf field <br />surfacing systems, and other field equipment as applicable. <br />D. Construction technical specifications complete. <br />E. Coordinate final value engineering and technical review by the GC and Design Lead. <br />F. Implement any revisions required as a condition of local permitting. <br />G. Review the Contractors final cost proposal and provide comment and recommendation. <br /> <br />1.4 PHASE IV –CONSTRUCTION PHASE <br /> <br />A. Attend pre‐construction conference as needed. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.