8 <br />Progressive Design Build Contract <br /> <br />shall be entitled to the rights and remedies set forth in Section 5.3 above. All drawings, specifications and <br />other documents and electronic data, including such documents identified in the General Conditions, <br />furnished by Design-Builder to Owner under this Contract (“Work Product”). <br /> <br />Article 6 <br />Contract Time <br />6.1 Date of Commencement. The Phase 1 Work contained in Exhibit C shall commence within five <br />(5) days of Design-Builder’s receipt of Owner’s Notice to Proceed unless the parties mutually agree <br />otherwise in writing. If additional Phase 1 Work is added to this Contract by a Phase 1 Amendment, that <br />added Phase 1 Work shall commence within five (5) days of Design-Builder’s receipt of Owner’s Notice to <br />Proceed for such Phase 1 Work unless the parties mutually agree otherwise in writing. The Phase 2 Work <br />shall commence within five (5) days of Design-Builder’s receipt of Owner’s Notice to Proceed for Phase 2 <br />Work (“Date of Commencement”) if the Proposal is accepted and the Contract Price Amendment is <br />amended to this Contract unless the parties mutually agree otherwise in writing. <br /> <br />6.2 Substantial Completion and Final Completion. <br /> <br />6.2.1 Substantial Completion of the entire Work shall be established in the GMP Amendment. <br /> <br />6.2.2 Final Completion of the Work or identified portions of the Work shall be achieved as <br />expeditiously as reasonably practicable. Final Completion is the date when all Work is complete <br />pursuant to the definition of Final Completion set forth in Section 1.2.31 of the General Conditions. <br /> <br />6.2.3 All of the dates set forth in this Article 6 (“Contract Time(s)”) shall be subject to adjustment <br />in accordance with the General Conditions. <br /> <br />6.3 Time is of the Essence. Owner and Design-Builder mutually agree that time is of the essence <br />with respect to the dates and times set forth in the Contract Documents. <br /> <br />6.4 Liquidated Damages. Liquidated damages, if any, shall be established in the GMP Amendment. <br /> <br />Article 7 <br />Price <br />7.1 Not Used. <br /> <br />7.2 Phase 1 Price. For completion of the Phase 1 Work set forth in Exhibit C as Exhibit C exists as <br />of the date of this Contract, Owner shall pay Design-Builder in accordance with Article 8 of this Contract a <br />sum not to exceed $2,901,602 (not including sales tax) for Phase 1A. If additional Phase 1 Work is added <br />by a Phase 1 Amendment, the Phase 1 Price will increase as established in the Phase 1 Amendment. <br />Phase 1 Work shall be billed at the all-inclusive billing rates and labor categories agreed to herein or in a <br />Phase 1 Amendment, and an agreed-upon not to exceed price. Any rates established shall not be subject <br />to increase for any Phase 1 Work. <br /> <br />7.3 Phase 2 Price. For Phase 2 Work, Owner shall pay Design-Builder in accordance with Article 8 of <br />this Contract and Article 6 of the General Conditions a contract price (“Contract Price”) set forth in the GMP <br />Amendment which shall be equal to the Pass-Through Costs (as defined in Section 7.6.3 hereof), plus <br />Design-Build Fee percentage (as defined in Section 7.5 hereof) applied to the Cost of the Phase 2 Work, <br />plus the Construction General Conditions Price (as defined in Section 7.4 hereof), plus the Cost of the <br />Phase 2 Work (as defined in Section 7.6.1 hereof), subject to the GMP established in the GMP Amendment <br />and governed by Section 7.7 hereof, and any adjustments made in accordance with the General Conditions.