Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
9 <br />Progressive Design Build Contract <br />7.4 Construction General Conditions Price. Owner shall pay the Construction General Conditions <br />Price of [$ to be added in GMP Amendment] for all Construction General Conditions Work as identified and <br />defined in Exhibit D (Construction General Conditions Work). The Construction General Conditions <br />Price shall be paid monthly based on the percent of Cost of Work completed in the month covered by <br />Design-Builder’s pay application during Phase 2. The Construction General Conditions Price shall cover all <br />construction general conditions work, regardless of whether the work is completed by the Design-Builder, <br />a Key Firm, or Subcontractor. <br />7.5 Design-Build Fee. <br />7.5.1 The Design-Build Fee shall be two point five seven percent (2.57%) multiplied by the Cost <br />of the Phase 2 Work. <br />7.5.2 The Design-Build Fee is intended to compensate Design-Builder for all costs and expenses <br />not specifically included elsewhere. The Design-Build Fee shall compensate Design-Builder for <br />all other costs, including but not limited to the following: <br />7.5.2.1 Profit on all work including self-performed work. <br />7.5.2.2 Profit Margins or similar mark-ups on cost for work performed by related parties or <br />entities of the Design Builder. <br />7.5.2.3 General administration costs associated with Design-Builder’s home office <br />operations, support staff, such as executives, HR, accounting, IT, etc. unless specifically <br />approved in advance by Owner. <br />7.5.2.4 Cost of centralized and generally shared information technology, equipment, <br />enterprise software and data processing. <br />7.5.2.5 Cost associated with bonuses or profit sharing. <br />7.5.2.6 Discretionary costs, such as clothing, awards or similar expenses. <br />7.5.2.7 Business and Occupancy (B&O) Taxes. <br />7.6 Cost of the Phase 2 Work. <br />7.6.1 Cost of the Phase 2 Work includes only those items expressly defined in this Section 7.6.1 <br />that are reasonably incurred by Design-Builder in the proper performance of the Phase 2 Work. <br />The Cost of the Phase 2 Work shall not include any Pass-Through Costs (as defined in Section <br />7.6.3), Construction General Conditions Work (as defined in Section 7.4 and Exhibit D), or costs <br />intended to be covered by the Design-Build Fee (as defined in Section 7.5). For the avoidance of <br />doubt, any confusion about the categorization of cost items between the Cost of the Phase 2 Work <br />and Pass-Through Costs shall be resolved in favor of Pass-Through-Costs. Further, any confusion <br />about the categorization of cost items between the Cost of the Phase 2 Work and Construction <br />General Conditions Fee or Design-Build Fee shall be resolved in favor of Construction General <br />Conditions Fee and Design-Build Fee, respectively. <br />The Cost of the Phase 2 Work shall include only the following: <br />7.6.1.1 Except for those supervisory and administrative personnel who are covered by the <br />Construction General Conditions Work (Exhibit D), wages of direct employees of Design- <br />Builder performing the Work at the Site or, with Owner’s agreement, at locations off the <br />Site.
The URL can be used to link to this page
Your browser does not support the video tag.