My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 <br /> <br /> <br />2. Energy Modeling: LEED <br />• LEED Energy Modeling - Points Estimate (IESVE) <br />o Build ASHRAE LEED Baseline model. <br />o Build LEED Proposed Design model. <br />o Determine LEED design energy cost savings and LEED carbon savings over the LEED <br />baseline. <br />o Determine estimated LEED points, utilizing renewables estimate provided by others. <br />• LEED Energy Modeling - Final (IESVE) <br />o Update LEED Proposed and Baseline energy models. <br />o Determine LEED design energy cost savings and LEED carbon savings over the LEED <br />baseline and associated LEED points, utilizing renewables estimate provided by <br />others. <br />o Complete MEPC sheet, narrative, and LEED form <br />• Excluded scope: Energy Code Compliance modeling, load modeling, and lifecycle cost analysis <br />are not included except as indicated below. <br /> <br /> <br />3. Design Assistance Energy Simulation <br /> <br />• Design Assistance Loads Modeling for Architecture Optimization (IESVE): <br />o Simple box model comparison of base design + 2 design iterations for massing, <br />orientation, roof/wall/glazing/shading selections, and window to wall ratio. <br />o Coordinate with team to determine desired solutions and additional modeling <br />direction. <br /> <br />• Design Assistance Energy Modeling for HVAC Optimization/pEUI Estimation (IESVE): <br />o Update energy model based on DD documents. <br />o Compare models of 3 different HVAC systems paired with other ECMs . <br />o Coordinate with design team to determine specific solutions and additional modeling <br />direction. <br />o Compare models of design plus 2 additional potential design iterations based on <br />design team requests. <br /> <br /> <br />4. LEED Daylighting Analysis Modeling <br /> <br />• Daylight/Glare Analysis of Alternate Designs for Fenestration, Glazing, & Shading Optimization <br />- (Ladybug): <br />o Run daylight & glare analysis to compare models of base design and 2 alt designs to <br />recommend design & materials <br />o Coordinate w/design team to determine specific solutions and additional modeling <br />direction <br />o Compare models of 3 potential designs/areas based on design team requests to <br />recommend design & materials <br />o Coordinate w/design team to determine final design solution <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.