My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 <br /> <br /> <br />2. Energy Modeling: LEED <br />• LEED Energy Modeling - Points Estimate (IESVE) <br />o Build ASHRAE LEED Baseline model. <br />o Build LEED Proposed Design model. <br />o Determine LEED design energy cost savings and LEED carbon savings over the LEED <br />baseline. <br />o Determine estimated LEED points, utilizing renewables estimate provided by others. <br />• LEED Energy Modeling - Final (IESVE) <br />o Update LEED Proposed and Baseline energy models. <br />o Determine LEED design energy cost savings and LEED carbon savings over the LEED <br />baseline and associated LEED points, utilizing renewables estimate provided by <br />others. <br />o Complete MEPC sheet, narrative, and LEED form <br />• Excluded scope: Energy Code Compliance modeling, load modeling, and lifecycle cost analysis <br />are not included except as indicated below. <br /> <br /> <br />3. Design Assistance Energy Simulation <br /> <br />• Design Assistance Loads Modeling for Architecture Optimization (IESVE): <br />o Simple box model comparison of base design + 2 design iterations for massing, <br />orientation, roof/wall/glazing/shading selections, and window to wall ratio. <br />o Coordinate with team to determine desired solutions and additional modeling <br />direction. <br /> <br />• Design Assistance Energy Modeling for HVAC Optimization/pEUI Estimation (IESVE): <br />o Update energy model based on DD documents. <br />o Compare models of 3 different HVAC systems paired with other ECMs . <br />o Coordinate with design team to determine specific solutions and additional modeling <br />direction. <br />o Compare models of design plus 2 additional potential design iterations based on <br />design team requests. <br /> <br /> <br />4. LEED Daylighting Analysis Modeling <br /> <br />• Daylight/Glare Analysis of Alternate Designs for Fenestration, Glazing, & Shading Optimization <br />- (Ladybug): <br />o Run daylight & glare analysis to compare models of base design and 2 alt designs to <br />recommend design & materials <br />o Coordinate w/design team to determine specific solutions and additional modeling <br />direction <br />o Compare models of 3 potential designs/areas based on design team requests to <br />recommend design & materials <br />o Coordinate w/design team to determine final design solution <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.