My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />DLR Group inc. <br />an Arizona corporation <br />6225 North 24th Street, Suite 250 <br />Phoenix, AZ 85016 <br /> <br /> <br />4/2/2025 <br /> <br />Re: Everett Multipurpose Sports Stadium – LEED Scope of Work <br /> <br /> <br />Please review the following Scope of Work document: <br /> <br /> <br />A. HPD Scope of Work: <br /> <br />DLR Group HPD is pleased to submit the following services associated with the pursuit of LEED v4 BD+C: New <br />Construction for the Everett Sports Stadium. The certification scope will cover the provided building area of <br />approximately 70,000 sf in area, seating approximately 5,000 maximum occupants, in Everett WA . The project <br />will be seeking: <br />• LEED v4 BD+C: New Construction, Silver certification <br /> <br /> <br />Scope item descriptions: <br /> <br />1. LEED Administration <br />• Complete an initial LEED scorecard. <br />• Register the project with USGBC (registration/certification costs passed through to owner). <br />• Pay for LEED Registration and LEED certification submissions (as reimbursables). <br />• Attend up to four (4) dedicated LEED Status meetings during Design phases. <br />• Lead (1) LEED Kick-Off meeting with project stakeholders (Owner, Design Team, Contractor) to <br />determine target credits and points attainable to achieve desired certification. <br />• Prerequisites & Credits will be assigned to design team members for tracking, achievement, <br />and documentation. <br />• Communicate LEED responsibilities to the project team, provide limited mentoring and <br />assistance on completion of LEED tasks. <br />• Coordinate and set LEED deadlines. <br />• Provide QC review of LEED Documentation before each LEED submission (Design Preliminary, <br />Design Final, Construction Preliminary, Construction Final). <br />• Submit the project for review by USGBC and follow-up with team members any review <br />comments need to be addressed and resubmitted. <br />• Achieve LEED Silver certification level at minimum. <br />• Excluded: Completion and documentation of LEED Construction prerequisites and credits is <br />the sole responsibility of the Contractor. FF&E will not be included in LEED credits. <br /> <br /> <br /> <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.