Laserfiche WebLink
Everett Multipurpose Stadium <br />Friday, April 18, 2025 <br />LEED BD+C v4 New Construction <br />Certification Level: LEED Silver <br />70,000 Sq. Ft. <br />LEED Administration LEED Silver <br />LEED points 37 *GC to complete all Const Credits, design team tasked to other credits <br />Admin Rate 1350.00 <br />LEED Admin Total 49,950.00$ <br />LEED Admin: Phase I 32,467.50$ <br />LEED Admin: Phase II 17,482.50$ <br />Subtotal 49,950.00$ <br />Simulation <br />Design Assistance Energy Simulation (Phase I) 35,000.00$ <br />Energy Model: LEED Submission (Phase I & II total) 42,000.00$ <br />Daylight modeling (Optional, Phase I only) -$ <br />Simulation Fee, No Options 77,000.00$ <br />Simulation Fee + Options Above 77,000.00$ <br />Total HPD Design Fee (Administration + Simulation)126,950.00$ <br />Total HPD Design Fee + Options 126,950.00$ <br />LEED Fees Not Included in Above Fee Proposal (pass through) <br />LEED Registration Fee $1,350 <br />Approx. LEED Fees for Split Design & Construction Reviews $4,970 <br />Total LEED Registration, Review Fees 6,320.00$ <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal