My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 11:21:56 AM
Creation date
7/3/2025 11:18:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Page 11 of 58 <br /> <br />c. Structure identifications. <br />d. Footage. <br />e. Pipe materials. <br />f. Pipe diameters. <br />g. Work order numbers. <br />h. Street names and other geospatial notations. <br />Provide dropdown menus to quickly select common information, including <br />defects, pipe materials, survey purpose, locations, and pipe usage. D <br />Layer elements must be color-coded, with options for standard color schemes <br />and user-configurable color schemes. D <br /> <br />C. Inspection data export and import <br />Functionality <br />D = Desired <br />R = Required <br />Can export completed inspections from the proposed inspection software to <br />Cityworks. The system must allow configuration for: <br />a. Inclusion or exclusion of certain inspection statuses. <br />b. Specification of Cityworks Template to be used when the completed <br />inspection is completed in Cityworks. <br />R <br />Include functionality to import new inspections from a defined set of Trimble <br />Cityworks inspection work items into the inspection software as new inspection <br />tasks to be completed. <br />R <br />A user interface must be provided to configure data mapping between <br />Cityworks and the inspection system. The interface must: <br />a. Specify the Cityworks entity type and the entity type in the inspection <br />software. <br />b. Specify the task mappings between Cityworks and entity type and the <br />inspection system software. <br />c. Specify the criteria for setting the fields in Cityworks, such as <br />workorder status, inspection status, and related task statuses. <br />d. Allow option to only Export tasks when there is an associated <br />inspection. <br />e. Allow mapping between other fields in the two systems. <br />R <br />Modification of the layout of Cityworks Office or Respond UI with a custom <br />button or other user interface control to open the completed inspection in the <br />inspection software for further examination and review. <br />D <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.