Laserfiche WebLink
Exhibit A (Scope of Work) <br />included in the Geotechnical Memorandum. Geotechnical reports will be included as an attachment in <br />Task 8.6. <br />TASK 6.1 DELIVERABLES <br />•Review comments on draft geotechnical reports <br />TASK 6.1 ASSUMPTIONS <br />•The geotechnical report will be utilized by Otak to guide the conceptual design of the culvert <br />foundation, possible retaining walls, and Pigeon Creek streambed <br />7.Intentionally left blank. <br />8.Agency Meetings and Permit Facilitation <br />Prior to permit submittals, Consultant will arrange a meeting, preferably on-site, with <br />applicable City, State, Tribes, and Federal resource and regulatory agency staff to <br />assure that they have a solid understanding of the existing and proposed conditions for <br />the project prior to receiving the JARPA package. After permits are submitted, the <br />Consultant will coordinate with City staff to respond to comments, provide additional <br />clarification, and assist with shepherding the permits through the process efficiently. <br />TASK 8.1 DELIVERABLES: <br />•Meeting agenda and minutes (draft and final) for all consultations.