Laserfiche WebLink
FLAG NOTES: <br /> 1 DEMOLISH EXISTING MEDICAL VACUUM PUMP.MAINTAIN AND PROTECT EXISTING VEC <br /> CIRCUIT FROM SWITCHBOARD 4Y1 D.REFER TO FLAG NOTE 2 ON THIS SHEET FOR <br /> RECONNECTION REQUIREMENTS. <br /> 2 EXTEND EXISTING CIRCUIT TO NEW MEDICAL VACUUM PUMP DISCONNECT.EXTEND ELECTRIC&TECHNOLOGIES <br /> CONDUIT AND CONDUCTORS AS REQUIRED.REFER TO SHEETS ED1.3 AND E1.3 FOR <br /> EXISTING MEDICAL VACUUM PUMP BRANCH CIRCUIT SIZE. <br /> 3 REFER TO ONE-LINE DIAGRAM ON SHEET E1.3 FOR EXISTING BREAKER SIZE. <br /> 4 COORDINATE EXACT LOCATION OF NEW MEDICAL VACUUM PUMP DISCONNECT WITH <br /> OWNER PRIOR TO INSTALLATION.PROVIDE CONNECTION TO MEDICAL VACUUM CONSULTANTS <br /> PUMPS AND CONTROLLER AS INDICATED. <br /> E B D EVIDENCE <br /> BASED <br /> DESIGN <br /> SERVICES <br /> M. <br /> c�y�op wasy�9 <br /> LOAD SUMMARY-SW BD 4Y1 D <br /> HP kVA A 1;�l <br /> s1'E1 <br /> � �t � <br /> EXISTING MEDICAL VACUUM PUMPS 2&3 (2)@ 10 21.6 26St0Nnt � <br /> NEW MEDICAL VACUUM PUMPS (2)@ 7.5 15.8 19 IC�1 <br /> NET LOAD REDUCTION 5.8 -7 <br /> MEDICAL VACUUM <br /> PUMP REPLACEMENT <br /> _ PROVIDENCE REGIONAL MEDICAL <br /> CENTER <br /> PACIFIC CAMPUS <br /> 916 PACIFIC AVE <br /> EVERETT,WA 98201 <br /> PUMP <br /> EXISTING MEDICAL NEW MEDICAL VACUUM PUMPS 3/4"C,3#10,&1#10G CU <br /> VACUUM PUMPS 2&3 &CONTROLLER 30AS <br /> (2)@ 10HP,480V/3P (2)@ 7.5HP,48OV13P 30AF <br /> 4 3 2 CONSTRUCTION <br /> a DOCUMENTS <br /> I LLLZZ�� <br /> LEVEL 1 - POWER DEMOLITION PLAN 2 LEVEL 1 - POWER PLAN <br /> E1.1 CALE:1/4"=V-0" EO.0 E1.1 CALE:1/4"=V-0" EO.O <br /> 1 0/1 812 0 24 CONSTRUCTION DOCUMENTS <br /> MARK DATE DESCRIPTION <br /> PROJECT NO:B24-1119 <br /> CAD DWG FILE:E11.DWG <br /> DRAWN BY:CRS <br /> CHK'D BY:KMD <br /> COPYRIGHT: <br /> SHEET TITLE <br /> LEVEL 1 - POWER <br /> FLOOR PLANS <br /> E1.1 <br />