Laserfiche WebLink
CENTER LEFT RIGHT ■ A&R SCOPE `,'I'' <br /> SYNERGY UNITS _ <br /> —STRING-1 STRING-2 STRING-3 STRING-4 STRING-5 STRING-6 STRING-7 STRING-8 STRING-9 I _ <br /> 18 18 20 20 20 22 22 22 22 <br /> EXISTING OR A&RSOLAr MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES OTHER SCOPE <br /> 3211 Martin Luther King Jr Way S. <br /> Seattle,WA 98144(206)707-9937 <br /> 0 P u o = o = o 0 o 1 1 <br /> TO UTILITY TRANSFORMER <br /> —(TY11) n _ _ <br /> /ROOFTOP <br /> , " \ ( ) ELECTRICAL ROOM 800A/3P f L': a) <br /> T HIS DRAWING TOOFS THE <br /> CONFFIDENTIAL INFORMATION OF A&R SOLAR <br /> (Typ.) I iNTERNET GATEWAY MCB AND ITS RECEPTORPOSSESSION DOES NOT <br /> CONFER ANY RIGHTTIN OR LICENSE TO USE IT <br /> DC Disconnect DC Disconnect` (PROVIDED BY OTHERS) OR THE INFORMATTION DISCLOSED HERE IN <br /> NOR ANY RIGHT TO REPRODUCE THIS <br /> DRAWING±> OR ANY PART HERE IN WITHOUT <br /> +� THE WRITTEN CONSENT OF A&R SOLAR. <br /> ` C > <br /> 225A/3P <br /> -RACEWAY (FROM ROOF STUB-UP TO <br /> A ( ) ( ) A ELECTRICAL ROOM) TO BE DONE BY OTHERS `^• ----1----1_i__ Z M <br /> p O <br /> o—i NJ <br /> (/)(50A/3P ( 175A/3P 1200A PANELAHPIA I— CO <br /> al <br /> U 208/120V 3P, 4W D I <br /> 6/ G 48,990 AFC Z Q Ce Q <br /> 35K AIC 7 65,000 AIC W ( <br /> /E\ (. ) 0 I- o H <br /> M 71- o w <br /> I, a o w <br /> � -/ a N < w <br /> 0 EQUIPMENT SCHEDULE H <br /> Electrical Schedule/ BOM 35K AIC W U Q <br /> Ref. Category Equipment QTY Z = Z <br /> 12 1 Modules Q.Peak DUO XL-G10.2 475 184 Output AC # of CC w <br /> 2 Optimizers P960 SolarEdge Dual Optimizer 93 Watts (w) — OCPD U O <br /> 3 Jbox Jbox TBD ct Inverter Specs (A) Voltage Inverters <br /> SolarEdge SE5OKUS 50000 139.5 208 1 175 w <br /> 4 Inverters SolarEdge SE14.4KUS 1 SolarEdge SE14.4KUS 14400 40 208 1 50 0 Q w <br /> ****N/A**** 0 0 0 0 ! LL a N <br /> 6 LoadCenters MLO, 200A, 208V, 3ph, Nema 1, 35K AIC 1 / _�__-__0I — I LU O <br /> 7 Disconnect 400A 600V 3 Polej Heavy Duty, Fuse, Lockable, 35K AIC 1 Module Specs Watts (w) Imp Vmp Voc lsc 00 <br /> DisconnectFuse FLNR- 225 A Fuses for Disconnect (qty 1/pole) 3 Q.Peak DUO XL-G10.2 475 475 10.66 44.54 ' 53.58 11.24 <br /> Monitoring SolarEdge Integrated (inverter) Monitoring 1 Temp. Adjusted 0 0 40.8 57.9 0 REVISIONS <br /> Breakers 50A/3P, 208V, 35k AIC 1 REV. # DATE: <br /> Breakers 175A/3P, 208V, 35k AIC 1 0 Oct 26, 2021 <br /> Breakers 225A/3P, 208V, 65k AIC 1 } PROVIDED <br /> BY OTHERS 1 may 22 <br /> 2 Jun 08, 2022 <br /> n CONDUCTOR SCHEDULE SINGLE LINE-BUILDING A 3 Jan 05,2023 <br /> Summary Distance (ft) Current Operating Voltage Volt. Drop NTS <br /> @125% Voltage Drop (total) GENERAL NOTES: <br /> A (2)#10 CU, (1)#10 EGC, PV Wire 600V, AIR 150 22.5A 600V 0.98% 2.36% <br /> B (10)#10 CU, (1)#10 EGC, THWN-2, 1.25"EMT(min) 90 22.5A 600V 0.59% UTILITY: SNOPUD DESIGNED: DANIEL H. <br /> C (3)4/0 AL, (1)#6 N, (1)#6 EGC,THWN-2, 2"EMT(min) 10 174.38A 208V 0.12% 1. EGC WHERE EXPOSED TO PHYSICAL DAMAGE WILL BE PM: ANDREW HOULE <br /> 6AWG BARE CU CELL: (262) 331-0485 <br /> D (3)#6 AL, (1)#10 N, (1)#10 EGC, THWN 2, 0.75"EMT(min) 10 50A 208V 0.27% 2. IF INSTALLING CONDUIT ON ROOF, MAINTAIN GREATER E1.1 SINGLE E (3)300 AL, (1)#4 N, (1)#4 EGC, THWN-2, 2.5"EMT(min) 10 224.38A 208V 0.11% THAN 7/8" ABOVE SURFACE <br /> LINE- <br /> 3. NEC 690.12: RAPID SHUTDOWN INITIATED BY LOSS OF BUILDING A <br /> - F (3)300 AL, (1)#4 N, (1)#4 EGC,THWN-2, 2.5"EMT(min) 15 224.38A 208V 0.16% GRID OR AC DISCONNECT <br />