|
Permit#: M2211-063
<br /> 1 1 1 2 I 3 I 4 I
<br /> 5. Site Address: 6600 EVERGREEN WAY
<br /> GENERAL LEGEND AIR DISTRIBUTION LEGEND DUCT FITTING REQUIREMENTS DRAWING INDE Owner: LARSON JOHN A
<br /> •` SYMBOL I DESCRIPTION SYMBOL I ABBR I DESCRIPTION THE FOLLOWING DUCT FITTINGS ARE CONSIDERED ACCEPTABLE.THE CONTRACTOR SHALL OBTAIN DWG.NO. I TITLE Tenant: Rafael Carrillo
<br /> ENGINEER'S APPROVAL FOR OTHER FITTINGS PRIOR TO FABRICATION.ONLY FITTINGS WITH EQUAL A DETAIL SYMBOL: A= IDENTIFYING NUMBER �� LIGHTING DU LINEWORK INDICATES OR LOWER PRESSURE DROP WILL BE CONSIDERED. M0.0 GENERAL
<br /> LSPECI GENERAL INFORMATION
<br /> e B=SHEET WHERE DETAIL IS SHOWN EXISTING DUCT OR EQUIPMENT M0.1 MECHANICPECIFICAICATI App. Date: 11/18/2022
<br /> DUCT ELBOWS OFFSETS MO.2 MECHANICAL SPECIFICATIONSW
<br /> NOTE:OFFSETS(TO AVOID OBSTRUCTIONS) Proposed Use: COMMERCIAL MECHANICAL(PLAN REVIE
<br /> WNW'SINDICATES DUCT OR EQUIPMENT ARE REQUIRED BUT ARE NOT MO.32 MECHANICAL SCHEDULES
<br /> SECTION SYMBOL:A= IDENTIFYING LETTER ��// TO BE REMOVED NECESSARILY SHOWN ON THE PLANS. M1.0 PUWS8SECTION REQUIRED)
<br /> 9 B= SHEETWHERESECTIONISSHOWN •
<br /> M2.0 MECHANICAL DETAILS
<br /> Bxi2 Description: Single ZonE Systems and Equipment
<br /> L �� 11= DUCT SIZE IN INCHES ATTACHED REFERENCE VENDOR DRAWINGS
<br /> SECTION CUT LINE INDICATOR FIRST SIZE LISTED IS SIDE SHOWN RDUCTS
<br /> DUCTS W/AIR VELOCITY MAX 15°
<br /> D - UNDER 1,500 FPM
<br /> D1 KEYED REFERENCE NOTE OR SHEET NOTE, }
<br /> ACOUSTIC LINED DUCT D=W
<br /> --- DUCTS W/AIR VELOCITY
<br /> e POINT OF CONNECTION(POC)SYMBOL OVER 1,500 FPM AND p By:
<br /> - .�'
<br /> 18'0 ALL DUCTS UPSTREAM OF Reviewed � Date• .�
<br /> S 4 ROUND DUCT IN INCHES T'Y�72MINAL UNITS
<br /> I MIU-1 I EQUIPMENT IDENTIFICATION(REFER TO SCHEDULES)
<br /> Bx,2.18 ( 45•QR 9D• OF EVERETT Office SetCITY Job Site Set Fire/Planning Set
<br /> OA �-� , OVAL DUCT IN INCHES RADIUS ELBOWS 8(24122
<br /> REVISION CLOUD AND REVISION NUMBER 12"z12"ACCESS PANEL REVIEWED '{��^_r �p�''�[p PERM pN
<br /> M 18x10 I I 18x12 .. CHANGE OF DUCT SIZE ON BOTTOM OF UPSTREAM OFT DUCT p� FOR 1 1
<br /> XX BINARY(YES/NO)SENSING SWITCH 6x10 8z12 VANES.REQUIRED FOR �n OBTAIN PRIOR APPROVAL
<br /> •
<br /> (PIPE OR DUCT MOUNTED) $ Q S CHANGE OF DUCT SIZE(TRIANGLE NOT ALWAYS SHOWN) RETURN AND EXHAUST DUCTS FOR ALL RETURN&
<br /> �i` EXHAUST LOCATIONS
<br /> TURNING VANES
<br /> TURNING VANES
<br /> XX BINARY(YES/NO)SENSING SWITCH S- RECTANGULAR SUPPLY DUCT ELBOW TURNED UP ACCESS PANEL(TYPICAL) -
<br /> (SURFACE
<br /> MOUNTED) CHANGE OF DUCT SIZE REQUIRED FOR RETURN GENERAL NOTES
<br /> &EXHAUST DUCTS
<br /> 9ANALOG SENSING DEVICE $-E1 RECTANGULAR SUPPLY DUCT ELBOW
<br /> (PIPE OR DUCT MOUNTED) TURNED DOWN OR AWAY 1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL MATERIALS AND LABOR NECESSARY TO
<br /> MAX.15° CONSTRUCT COMPLETE AND OPERATIONAL SYSTEMS.
<br /> XX ANALOG SENSING DEVICE 2. CONTRACTOR IS RESPONSIBLE FOR COMPLY NG WITH AND INCORPORATING ALL SPECIFICATIONS
<br /> (SURFACE MOUNTED) $
<br /> 01 - I RECTANGULAR RETURN/EXHAUST DUCT ELBOW TURNED UP TRANSITION IA NOT LESS THAN TWICE SUBTRACT WITH PACKAGE.
<br /> THE DUCT AREA LUNA MEXICAN GRILL
<br /> ® ANALOG SENSING DEVICE(SURFACE MOUNTED) CONICAL SPIN-IN OR 3. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND CORRECT ANY
<br /> (APPROPRIATE FOR MEASURED FLUID) r r,1 �� SIZE AT LEAST50%GREATER SITE,AS REQUIRED TO MEENNECTION DISCREPANCIES BETWEEN T ISTING WORK SHOWN ON ALLCODES AND REGULATIONS.
<br /> AND ACTUAL CONDITIONS ON 6600 EVERGREEN WAY
<br /> SUBSCRIPT LETTER(X)INDICATES: 5-Li l RECTANGULAR RETURN/EXHAUST DUCT ELBOW
<br /> TURNED DOWN OR AWAY
<br /> A-ALARM PRESSURE SENSOR THAN AREA OF SMALLER
<br /> D-DIFFERENTIAL PRESSURE $---3 SMALL RECTANGULAR DUCT ELBOW TURNED DOWN OR AWAYDUCT 4. COORDINATION WITH ALL TRADES IS REQUIRED TO AVOID CONFLICTS ANDDELAYS.NO EVERETT,WA
<br /> F-FLOW RATE END TAP ALLOWANCES WILL BE MADE FOR REWORK DUE TO POOR COORDINATION BETWEEN INVOLVED
<br /> H-HUMIDITY TRADES. 98203
<br /> L-LOW LIMIT Frli, ROUND DUCT ELBOW TURNED UP
<br /> P-PRESSURE(STATIC) 5. CONTRACTOR SHALL MAKE THE REQUIRED ARRANGEMENTS FOR TRANSPORTING ALL MECHANICAL C
<br /> C T-TEMPERATURE EQUIPMENT INTO THE BUILDING AND TO ITS FINAL INSTALLATION LOCATION.
<br /> V-VELOCITY&VOLUME FLOW RATE BRANCH DUCT TAKEOFFS
<br /> S-� W/MINIMUM PRESSURE DROP 6. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND VERIFYING DIMENSIONS PRIOR TO
<br /> �� ROUND DUCT ELBOW TURNED DOWN OR AWAY
<br /> ORDERING MATERIALS AND INSTALLING EQUIPMENT.THE DRAWINGS REPRESENT THE GENERAL
<br /> ABBREVIATIONS M,N&
<br /> RECTANGULAR ARRANGEMENT OF MECHANICAL AND ELECTRICAL SYSTEMS AND OTHER WORK.CONTRACTOR
<br /> DUCT SHALL MAKE REASONABLE MODIFICATIONS TO LAYOUT AND COMPONENTS TO AVOID CONFLICTS
<br /> ABBR I DESCRIPTION I ABBR I DESCRIPTION ••` END OF DUCT WITH CAP WITH OTHER TRADES.SIGNIFICANT MODIFICATIONS TO LAYOUTS AND COMPONENTS SHALL BE
<br /> t 45° REVIEWED AND APPROVED BY THE ARCHITECT/ENGINEER PRIOR TO CONSTRUCTION.SUCH
<br /> (UNLESS INDICATED OTHERWISE) • CONICAL MODIFICATIONS SHALL NOT BE GROUNDS FOR ADDITIONAL COMPENSATION TO CONTRACTOR.
<br /> AD ACCESS DOOR KW KILOWATT • SPIN-IN
<br /> AHU AIR HANDLING UNIT KWH KILOWATT HOUR • S-' 1Mh III I(I FLEX FLEXIBLE DUCT ROUND? OKONLY ROOUNDDUCT OSINGLE 7. CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS WITH SUFFICIENT LEAD TIME TO PREVENT
<br /> PP ACCESS PANELDELAYING THE COMPLETION OF THE PROJECT.DELAYS IN DELIVERIES WILL NOT BE CONSIDERED
<br /> APD AIR PRESSURE DROP L LENGTH RECTANGULAR UNDER DIFFUSER OR JUSTIFIABLE CAUSE FOR SUBMISSION OF SUBSTITUTE MATERIALS.
<br /> ARCH ARCHITECT/ARCHITECTURAL LAT LEAVING AIR TEMPERATURE 1.500 FPM GRILLE ONLY
<br /> LBS POUNDSIn 8. CONTRACTOR SHALL GIVE 24 HOUR NOTICE,IN WRITING,TO THE BUILDING ADMINISTRATOR(OR
<br /> BFP BACKFLOW PREVENTER LVG LEEAVINGAVING BDD BACKDRAFT DAMPER LF LOOT/FEET AD DUCT ACCESS DOOR MP APPOINTED REPRESENTATIVE)AND RECEIVE WRITTEN APPROVAL FROM THE BUILDING
<br /> ADMINISTRATOR PRIOR TO SHUT DOWN OR DISRUPTION OF SERVICE TO ANY AREA.CONTRACTOR
<br /> BHP BRAKE HORSEPOWER LWG LOW WALL GRILLE SHALL ALSO COORDINATE EXACT LOCATION AND TIMING OF SYSTEM(S)SHUT DOWN POINTS WLTH
<br /> BG BELOW GROUND LWR LOW WALL REGISTER RECTANGULAR ELBOW WITH TURNING VANES D- D=1/2W,BUT NOT THE OWNER REPRESENTATIVE.CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE THE
<br /> - BJ BETWEEN JOISTS LWT LEAVING WATER TEMPERATURE (SINGLE LINE) f®
<br /> II MORE THAN 12. DOWNTIME OR DISRUPTION OF ANY SYSTEMS. -
<br /> BTU BRITISH THERMAL UNIT (1/3W OK IF ACCESS PANEL
<br /> BTUH BRITISH THERMAL UNITS PER HOUR MAX MAXIMUM I UNDER 3,000 FPM) 9. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING FIRE AND/OR SMOKE RATING OF ALL
<br /> ITI MBH 10008RSH THERMAL --4 W �r PENETRATIONS.FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED WALLS,FLOORS,AND
<br /> C CENTIGRADE UNITS PER HOUR RADIUS ELBOW(SINGLE LINE) CEILINGS.ALL FIRE RATED PENETRATIONS SHALL BE TEMPORARILY FIRE STOPPED AT THE END OF
<br /> CC COOLING COIL MECH MECHANICAL M AIR EXTRACTOR EACH WORK DAY AND PERMANENTLY FIRE SOPPED AT THE COMPLETION OF THE PROJECT.
<br /> CD CEILING DIFFUSER MIN MINIMUM IIII ADJUSTABLE FROM
<br /> CFM CUBIC FEET PER MINUTE MTD MOUNTED OUTSIDE DUCTWORK. 10. COORDINATE ALL DIFFUSER/GRILLE INSTALLATIONS WITH ARCHITECTURAL REFLECTED CEILING
<br /> CG CEIUNG GRILLE MTG MOUNTING $ $ BRANCH DUCT TAKE-OFF OK ONLY OBTAIN PRIOR PLAN AND ARCHITECTURAL ELEVATIONS.
<br /> CI CAST IRONAPPROVAL FOR ALL
<br /> CLG CEIUNG WA NOT APPLICABLE (SINGLE LINE) UNDER RETURN AND EXHAUST 11. ALL NEW VOLUME DAMPERS INSTALLED SHALL BE FLAGGED WITH FLUORESCENT ORANGE PERMIT SET
<br /> 1,500 FPM
<br /> CO CLEANOUT WC NORMALLY CLOSED IWf LOCATIONS SURVEYOR'S TAPE FOR IDENTIFICATION.
<br /> CONC CONCRETE WO NORMALLY OPEN -'1 t=-
<br /> CORN CONNECT or CONNECTION NC NOISE CRITERIA L VD VOLUME DAMPER R=1/2W 12. SIZES OF DUCT RUNOUTS,FLEXIBLE DUCT CONNECTIONS,AND SPIN-IN TAPS SHALL BE EQUAL TO
<br /> CONST CONSTRUCTION NTS NOT TO SCALE DUCTS W/AIR VELOCITY DIFFUSER NECK SIZE.SEE PLANS.
<br /> CONT CONTINUATION - UNDER 1,500 FPM
<br /> CR CONDENSATE RETURN OA OUTSIDE AIR TWO-POSITION PARALLEL-BLADE DAMPER R=W 13. ALL DUCTWORK SHALL BE SUPPORTED IN STRICT COMPLIANCE WITH SMACNA OR LOCALLY
<br /> OBD OPPOSED BLADE DAMPER II WI ACTUATOR DUCTS VW AIR VELOCITY ACCEPTED CODE,WHICHEVER IS STRICTER.
<br /> B DB DECIBLE or DRY BULB 0/C ON CENTER OVER 1,500 FPM AND B
<br /> DDC DIRECT DIGITAL CONTROL OD OUTSIDE DIAMETER ALL DUCTS UPSTREAM OF 14. ALL DUCTWORK SHALL BE FLANGED SHEET METAL UNLESS NOTED OTHERWISE.ALL DUCT SHALL
<br /> DIA DIAMETER FDPR FIRE DAMPER 'TSBMINAL UNITS
<br /> BE CONSTRUCTED PER LATEST VERSION OF SMACNA DUCT CONSTRUCTION STANDARDS
<br /> DIM DIMENSION PD PRESSURE DROP
<br /> DN DOWN PH or0 PHASE INCLUDING DUCT MIN THICKNESS.
<br /> DPR DAMPER POC POINT OF CONNECTION I SDPR SMOKE DAMPER 15. INSULATION USED IN THIS PROJECT SHALL MEET CRITERIA PRESCRIBED BY LOCALLY ACCEPTED
<br /> DWG DRAWING PRV PRESSURE REDUCING VALVE
<br /> PSI POUNDS PER SQUARE INCH CODES.
<br /> E-10D EXHAUST AIR
<br /> NUMBER INDICATES CFM QUANTITY FA RETURN AIR FSD FIRE/SMOKE DAMPER W/ACTUATOR 16. ALL DUCT/PIPE DIMENSIONS INDICATE INSIDE NET FREE AREA ALL MITERED RECTANGULAR
<br /> o EA EACH ELBOWS SHALL HAVE TURNING VANES.
<br /> AIR GRILLE RAG RETURN ILLE
<br /> EAT ENTERING AIR TEMPERATURE READ REQUIRED I 17. THERMOSTATS SHALL BE INSTALLED AT 48'ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE.
<br /> a EF EXHAUST FAN RPBP REDUCED PRESSURE BACKFLOW , MD MODULATING OPPOSED BLADE DAMPER
<br /> EG EXHAUST GRILLE PREVENTOR W/ACTUATOR TYPE 18. DUCT SMOKE DETECTORS,AS SHOWN IN PLANS,TO PROVIDE AUTOMATIC SHUTDOWN IN
<br /> 2 R ELEC ELECTRIC or ELECTRICAL RPM REVOLUTIONS PER MINUTE I
<br /> ELEV ELEVATION SEPARATE : {.�("S [°� ACCORDANCE WITH LOCALLY ACCEPTED CODES.DUCT SMOKE DETECTORS SHALL BE PROVIDED
<br /> - ESP EXTERNAL STATIC PRESSURE HOOD D WITH WALL MOUNTED REMOTE TEST/ANNUNCIATOR STATION. REV DATE DESCRIPTION
<br /> EWT ENTERING WATER TEMPERATURE SASF SUPPLY AIR I BDD BACKDRAFT DAMPER & SUPPRESSION 19. SEE PLANS FOR CONDENSATE DRAIN ROUTING.CONDENSATE DRAIN SHALL NOT BE ROUTED TO PROJ.NO. 221999
<br /> EXH EXHAUST SF SUPPLY FAN +
<br /> EXST or E EXISTING A /'� REQUIRED
<br /> �] (''� HARD SURFACES.ROUTE CONDENSATE DRAIN LINES TO SANITARY SEWERS,STORM DRAINS, -▪ - () SIM SIMILARL SUBMITTALS V IITTALS REQUIRED DRYWELAUTHOR�OR GRASSY AREA AS INDICATED ON DRAWINGS,OR AS ALLOWED BY LOCALDRAWN NH
<br /> y F FACE ARE IT SP STATIC SQ SQUARE PRESSURE ® DSD DUCT SMOKE DETECTOR FOR
<br /> �']�,q
<br /> 175 FA FACE AREA PERMIT
<br /> g FCO FLOOR CLEANOUT SQ FT SQUARE FOOT/FEET a 20.MAINTAIN ALL MANUFACTURERS'RECOMMENDED SERVICE CLEARANCES FOR ALL EQUIPMENT. CHECKED TB
<br /> $ FCU FAN COIL UNIT SS STAINLESS STEEL
<br /> FD FLOOR DRAIN STD STANDARD INDICATES SUPPLY AIR FLOW DIRECTION 21.REFER TO ARCHITECTURAL SITE PLANS FOR LOCATION OF BUILDING. DATE 08/24/2022
<br /> `LA
<br /> FLR FLOOR TIiK THICK
<br /> -' FPM FEET PER MINUTE INDICATES RETURN or EXHAUST AIR FLOW DIRECTION 22.ALL CONTROLS CONDUIT AND WIRING INSTALLED BY CONTROLS CONTRACTOR.ALL CONTROLS
<br /> i FPS FEET PER SECOND TP TRAP PRIMER or TEST PLUG DEVICES TO BE SELECTED,INSTALLED,CONFIGURED AND TESTED BY THE CONTROLS ©COFFMAN ENGINEERS INC.
<br /> FT FOOT/FEET TYP TYPICAL CONTRACTOR TO ACHIEVE THE OPERATIONAL INTENT COMMUNICATED THROUGH THESE
<br /> TU TERMINAL UNIT CEILING SUPPLY DIFFUSER.REFER INFORMATION.
<br /> AND DRAWINGS.CEI HIGHLY RECOMMENDS THE MECHANICAL CONTRACTOR HIRE A CONTROLS SHEET TITLE:
<br /> g FV FACE VELOCITY ® CONTRACTOR TO DETAIL,INSTALL,AND COMMISSION THE CONTROLS UNLESS THEY HAVE THEIR
<br /> GRILLE SCHEDULE FOR ADDITIONAL INFORMATION.
<br /> O OWN IN HOUSE CONTROLS TECHNICIANS DEDICATED FULL-TIME TO THE DESIGN AND INSTALLATION
<br /> o GA GAGE N GAUGE DEC UNIFORM FIRE CODE
<br /> - GAL GALLON UFC UNIFORM FIRE CODE OF DIGITAL CONTROLS. COVER SHEET
<br /> E GALV GALVANIZED UMC UNIFORM MECHANICAL CODE LINEAR SLOT DIFFUSER.REFER TO DIFFUSER AND
<br /> EX GPH GALLONS PER HOUR UPC UNIFORM PLUMBING CODE GRILLE SCHEDULE FOR ADDITIONAL INFORMATION. 23.THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR STARTUP AND COMMISSIONING OF ALL &
<br /> GPM GALLONS PER MINUTE UG UNDERGROUND APPROVED EQUIPMENT INCLUDING PREPARING STARTUP FORMS FOR ALL EQUIPMENT,BALANCING AND GENERAL
<br /> UH UNIT HEATER REPORT BY NEBB OR AABC CERTIFIED BALANCER,FULL FUNCTIONAL TESTING OF EQUIPMENT TO
<br /> A GRD GRILLE,REGISTER,DIFFUSER I� - REFER TO DIFFUSER AND GRILLE SCHEDULE FORR) �{ of
<br /> o H HEIGHT VA VALVE ADDITIONAL INFORMATION. Office Community,Ptlanning 8L Economic Development CONFIRM ALL COMPONENTS WORK AND THE SYSTEMS FUNCTIEASINTENDED. A INFORMATION
<br /> HD HEAD VAC VACUUM PLANNING DEPARTMENT 24.ALL EQUIPMENT SHALL BE INSTALLED,PIPED,AND WIRED PER MANUFACTURERS INSTRUCTIONS.
<br /> 9 HP HORSEPOWER . VAV VARIABLE AIR VOLUME _
<br /> HTG HEATING VD VOLUME DAMPER �~ M -1 GRILLE,REGISTER OR OPEN DUCT 25.PROVIDE MECHANICAL SYSTEMS COMMISSIONING FOR ALL AUTOMATICALLY CONTROLLED
<br /> J HVAC HEATING,VENTILATION AND VEL VELOCITY (SUPPLY SHOWN) SYSTEMS PER WASHINGTON STATE ENERGY CODE.ALL CONTROLLED DEVICES SHALL BE
<br /> AIR CONDITIONING VFD VARIABLE FREQUENCY DRIVE CALIBRATED,TESTED,AND REPAIRED TO FUNCTION PER THE MANUFACTURER'S
<br /> VTR VENT THRU ROOF '[n/ RECOMMENDATIONS.PROVIDE DOCUMENTATION INDICATING TESTING METHODS AND RESULTS.
<br /> E HWG HIGH WALL GRILLE �ATE.'1 • /7�PROVIDE PRELIMINARY WRITTEND
<br /> DOCUMENTATION AS REQUIRED PRIOR TO APPLICATION FOR
<br /> HWR HIGH WALL REGISTER TYPE AIR TERMINAL TAG - CERTIFICATE OF OCCUPANCY.COMPLETED COMMISSIONING REPORT SHALL BE SUBMITTED TO
<br /> HZ HERTZ W WIDE
<br /> W/ WITH AIRFLOW (SEEGRD SCHEDULE) Name THE ARCHITECT/ENGINEER. SHEET NO:
<br /> ID INSIDE DIAMETER W/O WITHOUT
<br /> aS' IE INVERT ELEVATION
<br /> WB WET BULB • 26. PROVIDE ENERGY METERING AND ENERGY CONSUMPTION MANAGEMENT PER SECTION C409, O.O
<br /> "�y IN INCH or INCHES WCO WALLCLEANOUT INCLUDING THE FOLLOWING:
<br /> INSUL INSULATION WG WATER GAGE 1)C409.2-ENERGY SOURCE METERING:COORDINATE HVAC EQUIPMENT ELECTRICAL ENERGY
<br /> INV INVERT WGE WASTE. GAS EVACUATION METERING WITH ELECTRICAL CONTRACTOR.PROVIDE NATURAL GAS METERING PER C409.2.
<br /> WPD WATER PRESSURE DROP 2)C409.4-MEASUREMENT DEVICES,DATA ACQUISITION SYSTEM AND ENERGY DISPLAY TO COMPLY
<br /> $ PIT WEIGHT WITH THE REQUIREMENTS OF THIS SECTION.
<br /> SHEET OF XXX
<br /> A, 1 I 2 I 3 I 4 I 5
<br />
|