<br /> SPECIFICATIONS PRODUCT REQUIREMENTS BALANCING 2018 WASHINGTON STATE ENERGY CODE(WSEC)NOTES: TYPE I KITCHEN HOOD EXHAUST DUCT ENGINEERS
<br /> GENERAL REQUIREMENTS • THE MATERIAL AND EQUIPMENT SHALL BE NEW,BEST QUALITY AND AS SPECIFIED. BALANCING: PROVIDE.THE SERVICES OF A QUALIFIED BALANCING FIRM TO OBTAIN AIR HVAC NOTES BELOW APPLY TO THE HVAC SYSTEMS SERVING THE AREAS MATERIALS: 135 W.Fairhaven Ave
<br /> • EQUIPMENT SHALL BE FURNISHED COMPLETE WITH ALL PARTS NECESSARY FOR FLOWS WITHIN 10%OF THE AMOUNTS INDICATED ON THE DRAWINGS.BALANCING FIRM WORK IS SHOWN,OTHER BUILDING SPACE ARE NOT INCLUDED IN THIS Suite 102
<br /> PROPER OPERATION.MATERIAL AND EQUIPMENT SHALL BE CLEANED AND FREE FROM SHALL BEA MEMBER OF NEBB ORAABC.OBTAIN NE APPROVAL OF THE BALANCING FIRM PROJECT SCOPE OF WORK 1. KITCHEN HOOD EXHAUST DUCTS SHALL BE CONSTRUCTED OF AND SUPPORTED BY 16GA
<br /> SUMMARY DENTS,SCRATCHES,AND CORROSION.EQUIPMENT SHALL PROVIDE QUIET OPERATION. AT BEGINNING OF PROJECT.PROVIDE DRIVE ADJUSTMENTS AS REQUIRED TO OBTAIN THE STEEL OR IBGASTAINLESS STEEL. Burlington,WA 98233
<br /> FLOWS,AND PROVIDE TOTAL FLOW.PRESSURE,RPM AND AMPERAGE MEASUREMENTS AT EQUIPMENT SIZING.PERFORMANCE.&TYPE: h360.7D7.5656
<br /> THE WORK COVERED BY THIS AND ALL OTHER MECHANICAL SECTIONS CONSISTS OF EXECUTION ALL EQUIPMENT.AT THE COMPLETION OF THE PROJECT,COMPLETE AND SIGNED 2. FACTORY-BUILT GREASE DUCTS LISTED IN ACCORDANCE WITH UL 1978 SHALL BE PERMITTED P
<br /> FURNISHING ALL LABOR.EQUIPMENT,APPLIANCES AND MATERIALS AND PERFORMING ALL THE WORK SHALL BE PERFORMED BY PERSONS SKILLED IN THE PARTICULAR TRADE, BALANCING REPORTS SHALL BE SUBMITTED TO THE A/E IGNAN OWNER INDICATING ALL COMMUTED(EC)MOTORS OR SHALL HAVE A MIALL MOTORS SIZED FROM 1/12 HP TO 1 HP NIMUM EFFICIENCY OFL BE L 70 LY TO USE MATERIALS IN ACCORDANCE WITH THEIR LISTING.
<br /> OPERATIONS REQUIRED FOR A COMPLETE INSTALLATION OF ALL HEATING AND MEASURED VALUES ALONG WITH CORRESPONDING DESIGN VALUES AND PERCENT ( ) ALSO
<br /> VENTILATION SYSTEMS AS HEREINAFTER SPECIFIED,IN STRICT ACCORDANCE WITH THIS AND INCLUDES ALL WORK NECESSARY TO PROPERLY COMPLETE THE INSTALLATION IN NOTES/DISCUSSION WHERE RESULTS WERE NOT WITHIN 10%OF DESIGN VALUES. BE (INEQUIPPED WITH ACCORDANCE TO ADJUST MOTOR 1SPEEDO PER 2018 SHALL WSEC OPENINGS: W W W.00Hrtlan"Coal
<br /> A MANNER THAT PRESENTS A NEAT AND FINISHED APPEARANCE. MEANS
<br /> AND ALL SECTIONS OF THESE SPECIFICATIONS,DRAWINGS,TERMS AND CONDITIONS OF BASIC MATERIALS AND METHODS(APPLIES TO ALL WORK C405.8. 1. FOR COMMON EXHAUST DUCT SYSTEMS,ACCESS PANEL OPENINGS SHALL BE PROVIDED
<br /> THE CONTRACT,ALL APPLICABLE CODES,ORDINANCES AND LAWS GOVERNING EACH • THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS )
<br /> SYSTEM.UPON COMPLETION,THE SYSTEMS SHALL BE FULLY FUNCTIONAL,ADJUSTED,AND RECOMMENDED BY THE EQUIPMENT MANUFACTURER, REQUIRED BY CODES AND 2. IN ACCORDANCE WITH C405.8 OF THE 2018 WSEC ALL ELECTRIC MOTORS FOR INSTALLATION AND SERVICING OF THE FIRE-EXTINGUISHING SYSTEM.
<br /> READY FOR USE. GENERAL SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF TABLES
<br /> NECESSARYLS,V THE PROTECTIONOF PERSONNEL, BEP O SCREENS,ANDI GUARDS, 0 $ H'
<br /> D ALL INTO AND EQUIPMENT LNG CO E INWITH ACCORDANCE WITH THE FOLLOWING: INAN RELIEF PROVE, MNTN,OVERFLOW,ETC.,WHICH SHALL PROVIDED INSTALLED C405.6(1)THROUGH CA05.8(4) 2. ON PERSONNEL HORIZONTALNDUCTS,SUPPORT AT LEAST ONE 20 R•20 IN.OT R SHALL DUCT SYSTEMS 24IN. `�4 C
<br /> ICC/ANSI
<br /> 11ATIO0,ACCESSIBLE AND SBLE BUEWINGAAED FACILITIES,
<br /> IN AN APPROVED MANNER. UNDERORK INCLUDED:ION THIS SECTION AD REPRES ALL MECHANICALIREMNTSWO IN NORMALLYTH SPECIFIED NDLARGER
<br /> ENTRY. NMS IMRHORIZONTALSHALL
<br /> GREASE SYSTEMS Sr
<br /> ICC/ANSI A117.1-09,ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES,WITH STATEWIDE UNDER DIVISIONS 21,22 AND 23,AND REPRESENTS REQUIREMENTS ADDITION TO THE 3. FAN MOTORS SHALL BE THE SMALLEST AVAILABLE MOTOR SIZE GREATER AND LARGER IN ANY CROSS-SECTIONAL DIMENSION SHALL BE DESIGNED FOR THE WEIGHT i'J
<br /> AMENDMENTS • CONTRACTOR SHALL INSTALL ALL EQUIPMENT FOLLOWING ALL MANUFACTURER'S REQUIREMENTS STATED IN OTHER SECTIONS.THESE SPECIFICATIONS DO NOT COVER ALL THAN FAN BHP UNLESS OTHERWISE NOTED PER 2018 WSEC C403.8.2. OF THE DUCTWORK PLUS 800 LB AT ANY.POINT IN THE DUCT SYSTEMS. l" X ��
<br /> 2018 INTERNATIONAL MECHANICAL CODE WITH STATEWIDE AMENDMENTS REQUIREMENTS.CONTACT ENGINEER IF CONFLICTS ARISE. ITEMS THAT WILL BE REQUIRED FOR COMPLETE AND WORKING SYSTEMS.WHERE
<br /> MATERIALS OR EQUIPMENT NEEDED FOR THIS PROJECT ARE NOT COVERED IN THESE .k. '
<br /> 2018 INTERNATIONAL FIRE CODE WITH STATEWIDE AMENDMENTS 4. ALL MOTORS SHALL BE ENERGY EFFICIENT MOTORS MEETING NEMA
<br /> 2018 UNIFORM PLUMBING CODE WITH STATEWIDE AMENDMENTS SPECIFICATIONS,PROVIDE THE MATERIALS AND EQUIPMENT OF A QUALITY EQUAL TO OR STANDARD MG-7 EXCEPT THOSE INCLUDED IN PACKAGED EQUIPMENT 3. ON VERTICAL DUCTWORK WHERE PERSONNEL ENTRY IS POSSIBLE,ACCESS SHALL BE /:;
<br /> INSTALLATION,GENERAL: FOLLOW MANUFACTURER'S INSTRUCTIONS AND UTILIZE BETTER THAN THAT GENERALLY UTILIZED BY THE INDUSTRY FOR SIMILAR PROJECTS IN PROVIDED AT THE TOP OF THE VERTICAL RISER TO ACCOMMODATE DESCENT.WHERE
<br /> 2018 WASHINGTON STATE ENERGY CODEWITH EFFICIENCY RATED AS WHOLE UNIT. .,�teN.°
<br /> 2018 INTERNATIONAL EXISTING BUILDING CODE WITH STATEWIDE AMENDMENTS FOUND IN GOOD INDUSTRY PRACTICE WHEN INSTALLING ALL WORK USEL ONLYSKILLED THE SAME GEOGRAPHIC AREA. PERSONNEL ENTRY IS NOT POSSIBLE,ADEQUATE ACCESS FOR CLEANING SHALL BE
<br /> TRADESPEOPLE WITH QUALIFIED SUPERVISION. ALL WORK SHALL BE LEFT NEAT AND PROVIDED ON EACH FLOOR
<br /> THE IBC CLEAN. A.SUPPORT AND HANGERS 5. HEATING AND COOLING LOADS HAVE BEEN PERFORMED PER ASHRAE 8124/22
<br /> NATIONAL ELECTRICAL CODE(NFPA 70)WITH STATEWIDE AMENDMENTS STANDARDS.
<br /> 4. OPENINGS SHALL BE PROVIDED AT THE SIDES OR AT THE TOP OF THE DUCT,WHICHEVER IS
<br /> OTHER RELEVANT NATIONAL FIRE PROTECTION(NFPA)ASSOCIATION AND AMERICAN • CONCEALMENT: PIPING AND DUCTWORK SHALL BE CONCEALED WITHIN BUILDING SUPPORT OF MECHANICAL SYSTEMS:EACH PIECE OF EQUIPMENT SHALL BE SUPPORTED 6. HVAC EQUIPMENT SIZED NO LARGERTHAN THE NEXT LARGEST UNIT MORE ACCESSIBLE,AND AT CHANGES OF DIRECTION.THE ENTIRE LENGTH OF A GREASE
<br /> PETROLEUM INSTITUTE(API)INDUSTRY CODES. CONSTRUCTION,UNLESS SPECIFICALLY INDICATED OTHERWISE. WHERE PIPING IS (FROM ABOVE OR BELOW)IN NOT LESS THAN FOUR CORNERS FROM THE BUILDING AVAILABLE ABOVE THE CALCULATED HEATING/COOLING LOADS PER 2018 DUCT NEEDS TO BE ACCESSIBLE FOR INSPECTION AND CLEANING.OPENINGS SHALL BE
<br /> UNDERWRITERS'LABORATORIES. INDICATED TO BE EXPOSED TO VIEW IN FINISHED SPACES OR CABINETS,PROVIDE STRUCTURE.PIPING AND DUCTWORK SHALL BE SUPPORTED AT INTERVALS SPECIFIED, WSEC C403.3.1. PROTECTED BY APPROVED ACCESS CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH
<br /> LOCAL UTILITY CODES. CHROME ESCUTCHEONS WHERE THE PIPING PENETRATES THE WALL FLOOR OR WITH EACH SYSTEM SUPPORTED INDEPENDENTLY FROM THE BUILDING STRUCTURE. THE REQUIREMENTS OF THE IMC SECTION 506.3.8.
<br /> ALL APPLICABLE INDUSTRIAL SAFETY AND HEALTH LAWS AND REGULATIONS. CEILING CONSTRUCTION. 7 CONTROLS TO USE A 5°F MINIMUM DEADBAND BETWEEN HEATING AND
<br /> ALL APPLICABLE ENERGY CODES. .SEISMIC BRACING:PROVIDE COMPLETE SEISMIC BRACING FOR ALL NEW PIPING, COOLING PER 2018 WSEC C403.4.1.2.
<br /> LOCAL PLUMBING CODES. • WATER SEALING AT FLOORS: PROVIDE WATER TIGHT SEALING AT EACH FLOOR DUCTWORK,TERMINAL UNITS AND EQUIPMENT AS REQUIRED BY THE 2018 IBC WITH ALL
<br /> _ LOCAL BUILDING,MECHANICAL AND FIRE CODES. PENETRATION INCLUDING PIPING WITHIN WALL CAVITIES.PROVIDE WATER SLEEVES LOCAL AMENDMENTS AND ASCE/SCI 7-10(THE CURRENT CODE).BRACING MAY BE PER ACCESS PANELS: -
<br /> ALL GOVERNING RULES AND REGULATIONS BY LOCAL AND STATE AUTHORITIES. SEALED TO THE FLOOR CONSTRUCTION AND PROJECTING NOT LESS THAN 1.5'ABOVE GUIDELINES ESTABLISHED BY RESTRAINT MANUFACTURERS SUCH AS;MASON 8. AUTOMATIC SETBACK/SHUTOFF:PROVIDE WITH DDC CONTROL SYSTEM AS
<br /> ALL CONTRACT DOCUMENTS PERTAINING TO THIS PROJECT ARE HEREBY MADE A PART OF FLOOR WHERE INSULATED PIPING PENETRATES THE FLOOR.THE INTENT IS TO INDUSTRIES AND I.S.A.T PROVIDED THEY MEET THE CURRENT CODE.ALL BRACING SHALL PER 2018 WSEC C403.4.2.2. 5. ACCESS PANELS SHALL BE OF THE SAME MATERIAL AND THICKNESS AS THE DUCT.ACCESS
<br /> THIS SPECIFICATION. MINIMIZE PASSAGE OF WATER DURING A SIGNIFICANT WATER LEAKAGE EVENT. BE DESIGNED AND MANUFACTURED BY MASON,I.S.A.T,OR PRIOR-APPROVED ALTERNATE. PANELS SHALL HAVE A GASKET OR SEALANT THAT IS RATED FOR 1500°F AND SHALL BE
<br /> THE CONTRACTOR IS RESPONSIBLE TO MAKE SURE OF A CLEAR UNDERSTANDING OF BOTH SEALING IS REQUIRED FOR CONCRETE FLOORS,BUT NOT REQUIRED FOR OTHER MANUFACTURER SHALL FURNISH PROJECT-SPECIFIC DRAWINGS SHOWING THE CORRECT 9. AUTOMATIC START AND STOP CONTROLS:PROVIDE WITH AUTOMATIC GREASE TIGHT.
<br /> PLANS AND SPECIFICATIONS,PRIOR TO COMMENCEMENT OF WORK.ANY DISCREPANCIES FLOOR SYSTEMS WHERE THE CONSTRUCTION ITSELF,AT THE PIPE PENETRATION, BRACE FOR EACH PROJECT-SPECIFIC LOCATION. START AND STOP CONTROLS AS PER 2018 WSEC C403.4.2.3.
<br /> SHALL BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AND ENGINEER ALLOWS SIGNIFICANT WATER SEEPAGE(PLANKED WOOD FLOOR FOR EXAMPLE.) 6. FASTENERS,SUCH AS BOLTS,WELD STUDS,LATCHES.OR WING NUTS,USED TO SECURE
<br /> PRIOR TO COMMENCEMENT OF WORK.THE ENGINEER SHALL NOT BE HELD ACCOUNTABLE CONNECTIONS TO THE BUILDING STRUCTURE:PROVIDE ALL NECESSARY CONNECTIONS TO 10. WHERE LOCATED WITHIN UNCONDITIONED SPACE AND PLENUMS ALL THE ACCESS PANELS SHALL BE CARBON STEEL OR STAINLESS STEEL AND SHALL NOT
<br /> FOR LACK OF NOTIFICATION BY THE MECHANICAL AND/OR PLUMBING CONTRACTORS. • COORDINATION WITH OTHER TRADES:COMPLETE DRAWINGS AND SPECIFICATIONS OF THE BUILDING STRUCTURE FOR SEISMIC RESTRAINTS AND SUPPORTS.WHERE CONCRETE SUPPLY AND RETURN DUCTWORK SHALL BE INSULATED WITH A MINIMUM PENETRATE DUCT WALLS.
<br /> ALL TRADES WILL BE FURNISHED OR WILL BE AVAILABLE FOR INSPECTION IN THE STRUCTURE IS PRESENT,REVIEW THE USE OF CONCRETE ANCHORS WITH THE ARCHITECT, OF 13-6 INSULATION.WHERE SUPPLY AND RETURN DUCTWORK IS LOCATED LUNA MEXICAN GRILL
<br /> OWNER,AND GENERAL CONTRACTOR,AND VERIFY THAT THERE ARE NO POST-TENSIONED OUTSIDE OF A BUILDING DUCT IN CLIMATE ZONE 4 SHALL BE INSULATED TO
<br /> EXISTING CONDITION INFORMATION CONSTRUCTION OFFICE AT THE JOBSITE, CAREFULLY CHECK THESE DRAWINGS AND SLABS OR OTHER CONDITIONS THAT NEED TO BE TAKEN INTO ACCOUNT IN SETTING OF A MINIMUM OF R-8,AND DUCT LOCATED IN CLIMATE ZONE 5 SHALL BE 7. ACCESS PANELS IN A HORIZONTAL DUCT SHALL BE AT LEAST 1-1/2"ABOVE THE BOTTOM OF 6600 EVERGREEN WAY
<br /> SPECIFICATIONS BEFORE INSTALLING ANY WORK IN ALL CASES,CONSIDER THE WORK ANCHORS.UTILIZE MCCULLOUGH"KWIK-BOLT",PHILLIPS SELF-DRILLING ANCHORS, INSULATED TO A MINIMUM OF R-12. THE DUCT.MAXIMUM LENGTH BETWEEN ACCESS PANELS IS 2D FEET.SEE IMC 506.3.9 FOR
<br /> BEFORE SUBMITTING BID, THE CONTRACTOR SHALL EXAMINE SITE CONDITIONS TO OF ALL OTHER TRADES AND COORDINATE WORK WITH THAT OF THE SHEET METAL, GREGORY'BULLDOG,OMARK"DRILL ANCHORS",OR OTHER APPROVED ANCHOR TO OTHER OPENING REQUIREMENTS.
<br /> DETERMINE ANY EFFECT ON EXECUTION OF WORK AND INCLUDE COSTS IN BID.BY PIPING,PLUMBING,FIREPROTECTION,ELECTRICAL,AND SITE-WORK SUBCONTRACTORS, ATTACH TO CONCRETE STRUCTURES. WHERE BUILDING STRUCTURE/S WOOD OR STEEL, 11. SUPPLY DUCT WHICH CONVEYS SUPPLY AIR AT TEMPERATURES LESS EVERETT,WA
<br /> SUBMITTING A BID THE CONTRACTOR IS ACKNOWLEDGING THAT THEY HAVE SUFFICIENTLY SO THAT THE BEST ARRANGEMENT OF ALL EQUIPMENT,PIPING,CONDUIT,DUCTS,AND OBTAIN ARCHITECT APPROVAL OF HARDWARE AND METHODS TO BE UTILIZED FOR THAN 55 DEG F OR GREATER THAN 105 DEG F,WHEN LOCATED IN 8. LISTED GREASE DUCT ACCESS DOOR ASSEMBLIES(ACCESS PANELS)SHALL BE INSTALLED IN UNDERSTOOD THE SCOPE OF CONSTRUCTION WORK REQUIRED AND HAVE INCLUDED IN OTHER RELATED ITEMS CAN BE OBTAINED. ATTACHMENT TO THE STRUCTURE. CONDITIONED SPACE,SHALL BE INSULATED WITH A MINIMUM INSULATION ACCORDANCE WITH THE TERMS OF THE LISTING AND THE MANUFACTURER'S INSTRUCTIONS. 98203
<br /> BID,WHETHER SPECIFIED OR NOT,THE SUPPLY AND INSTALLATION OF ALL ITEMS R-VALUE IN ACCORDANCE WITH TABLEC403.10.12
<br /> REQUIRED BY GOOD PRACTICE TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS. • ELECTRICAL CLEARANCES:COORDINATE WITH ALL TRADES TO MAINTAIN ELECTRICAL ADDITIONAL FRAMING:PROVIDE STEEL FRAMING MEMBERS TO TRANSFER LOAD FROM INSTALLATION:
<br /> C SERVICE CLEARANCE (PER NATIONAL ELECTRICAL CODE) FOR MECHANICAL SUPPORT POINTS AT HANGERS TO LOCATIONS WHERE CONNECTIONS CAN BE MADE TO 12. RETURN OR EXHAUST DUCTWORK THAT IS LOCATED WITHIN A C
<br /> PERMIT APPLICATION EQUIPMENT. THE BUILDING STRUCTURE.FRAMING MEMBERS SHALL BE 12-GAUGE MINIMUM,1-3/8"X CONDITIONED SPACE AND CONVEYS RETURN OR EXHAUST AIR
<br /> 1-5/8"MINIMUM CROSS-SECTION SIZE;UNISTRUT,POWERSTRUT,OR OTHER DOWNSTREAM OF AN ENERGY RECOVERY DEVICE SHALL BE INSULATED 1. THE GREASE DUCT SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
<br /> OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED BEFORE AND DURING QUALITY REQUIREMENTS - APPROVED.SELECT MEMBER SIZE AND TYPE,AS APPROPRIATE FOR LOAD PER WITH A MINIMUM R-VALUE IN ACCORDANCE WITH TABLE C403.10.1.2 INTERNATIONAL MECHANICAL CODE SECTION 506 AND NFPA 96.ALL SEAMS,JOINTS,
<br /> CONSTRUCTION. MANUFACTURER GUIDELINES. PENETRATIONS,AND DUCT-TO-HOOD COLLAR CONNECTIONS SHALL HAVE A LIQUIDTIGHT
<br /> 13. DUCTS CONVEYING OUTSIDE AIR:PER 2018 WSEC SECTION C403.10.1.1 ALL CONTINUOUS EXTERNAL WELD EXCEPT AS PERMITTED BY THE REFERENCED CODE ABOVE.
<br /> • ON COMPLETION OF THE WORK.FURNISH SATISFACTORY EVIDENCE THAT ALL WORK PIPE HANGERS:CLEVIS OR RING HANGERS WITH STEEL RODS.HANGERS FOR INSULATED BUTT WELDED CONNECTIONS SHALL NOT BE PERMITTED
<br /> DUCTS CONVEYING OUTSIDE AIR FROM THE EXTERIOR OF THE BUILDING .
<br /> SUBSTITUTION PROCEDURES HAS BEEN INSTALLED AND INSPECTED IN ACCORDANCE WITH THE APPLICABLE CODES. PIPING SHALL BE SIZED FOR OUTSIDE INSULATION AND 6'SHIELDS SHALL BE PROVIDED AT
<br /> • THE OWNER AND/OR GENERAL CONTRACTOR SHALL DECIDE WHETHER OR NOT THE ALL HANGERS TO PROTECT INSULATION.PIPE SUPPORT SPACING PER IMC.PROVIDE TOB THEINMECHANICALVLOPEINSULATIONSYSTEM SHALL EEET SA NOAIR ED SE AOD
<br /> THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAVE BEEN SELECTED AS THE BASIS OF FINISHED WORK IS SATISFACTORY AND IF ANY MATERIAL OR EQUIPMENT HAS NOT PLASTIC SEPARATION BETWEEN CLAMPS AND COPPER PIPE. C402 OF HE 2018 WEC.AAMIMINIMUM,
<br /> DUCT REQUIREMENTS A NOTED IN SECTION 2. HORIZONTAL DUCTS SHALL BE GRADED BACK TO THE HOOD CONNECTION FOR CLEANING.
<br /> DESIGN.THE CONTRACTOR MAY PROPOSE A SUBSTITUTION OF OTHER MATERIAL OR BEEN PROPERLY INSTALLED OR FINISHED.THE MECHANICAL AND/OR PLUMBING VAL2 ES THEIATE IN TA LE A MINIMUM,DUCTS SHALL BE INSULATED TO
<br /> EQUIPMENT,WHICH IN HIS OPINION WILL ACCOMPLISH THE DESIGN FUNCTION AND IS CONTRACTOR IS OBLIGATED TO REPAIR OR REPLACE THE MATERIAL OR EQUIPMENT INVALUES INDICATED IN TABLE C403.10.1.1 OF 2018 WSEC. 3. CLEARANCE BETWEEN DUCTS AND COMBUSTIBLE MATERIALS SHALL BE PROVIDED IN
<br /> HANGER RODS:HOT ROLLED STEEL ASTM A IN MUM TO SIZE FOR PRESSURE
<br /> SE ACCORDANCE WITH THE REQUIREMENTS OF SECTION 4 OF NFPA 96.
<br /> EQUAL TO THAT SPECIFIED.ALL COSTS INCURRED BECAUSE OF THIS SUBSTITUTION SHALL A MANNER SATISFACTORY TO THE OWNER WITHOUT COST TO THE OWNER. PIPING',ANSI B 31.1,WITH SAFETY FACTOR OF 5.MINIMUM ROD SIZE;1"PIPE AND SMALLER ,4. OUTSIDE AIR DUCT INSULATION SHALL MATCH PENETRATED BUILDING
<br /> BE BY THE CONTRACTOR. THE ENGINEER SHALL BE THE JUDGE OF THE QUALITY AND • GUARANTEE:GUARANTEE MATERIALS AND WORKMANSHIP FORA PERIOD OF ONE YEAR (240 POUNDS)=1/4"ROD,1-1/4"TO 2'PIPE(TO 610 POUNDS)=3/8"ROD,2-1/2"TO 4" PIPE ENVELOPE INSULATION VALUES UNLESS SERVING INDIVIDUAL SUPPLY AIR
<br /> SUITABILITY OF THE PROPOSED SUBSTITUTION AND MAY REQUIRE THE CONTRACTOR TO AFTER THE DATE OF SUBSTANTIAL COMPLETE.REFER TO ADDITIONAL REQUIREMENTS (TO 1.130 POUNDS)=1/2"ROD,5'TO 8"PIPE(TO 1,810 POUNDS).5/8"ROD. UNITS WITH LESS THAN 2.800 CFM OF TOTAL SUPPLY AIR CAPACITY, 4. PROVIDE GREASE RESERVOIRS PER IMC 506.3.7.1
<br /> FURNISH ANY MATERIAL OR PIECE OF EQUIPMENT AS SPECIFIED. OUTLINED BY ARCHITECT AND OWNER. PROVIDED THESE ARE INSULATED TO MINIMUM INSULATION VALUES
<br /> INSTALL HIGH DENSITY PRE-MOLDED PIPE INSULATION 180 DEGREES(HALF-SHELLS)ON INDICATED IN TABLE C403.10.1.1. 5. SLOPE DUCT PER IMC 506.3.7
<br /> PROJECT MANAGEMENT AND COORDINATION BOTTOM HALF OF PIPE AT SUPPORTS FOR PIPING GREATER THAN 1'IN DIAMETER,6'LONG
<br /> PROJECT CLOSE OUT DOCUMENTATION(C103.6): FOR PIPING 6'IN SIZE OR SMALLER.FOR COLD PIPE SUPPORTS USE 3.0 PCF DENSITY PROVIDE HIGH PRESSURE LEAK TEST AS SPECIFIED AND DUCT ENCLOSURES: -
<br /> _ • GENERAL:THE CONTRACTOR75.
<br /> OR SHALL SCHEDULE HIS WORK IN SUCH A MANNER AS TO POLYISOCYANURATE INSULATION.HOT PIPE SUPPORTS SHALL BE HIGH DENSITY REQUIRED PER 201E WSEC DUCTT.LEAK
<br /> AVOID DELAYS IN OVERALL CONSTRUCTION AND PERMIT PROPER INSTALLATION OF 1. THE FOLLOWING DOCUMENTS SHALL BE BE PROVIDED TO THE BUILDING OWNER OR POLYISOCYANURATE FOR FLUIDS UP TO 300 F,OR CALCIUM SILICATE.INSULATION AT . 1. WHERE VERTICAL FIRE BARRIERS ARE PENETRATED,THE DUCTS SHALL BE ENCLOSED IN A
<br /> ALL WORK BY THEMSELF AND OTHER CRAFTS. OWNER'S AUTHORIZED AGENT WITH 180 DAYS OF THE DATE OF RECEIPT OF THE SUPPORTS SHALL HAVE SAME THICKNESS AS ADJACENT INSULATION. CONTINUOUS ENCLOSURE EXTENDING FROM THE FIRST PENETRATED FIRE BARRIER AND
<br /> CERTIFICATE OF OCCUPANCY: 1K. AUTOMATIC(MOTORIZED,FAIL CLOSES)DAMPERS AT OUTSIDE AIR ANY SUBSEQUENT FIRE BARRIERS OR CONCEALED SPACES TO OR THROUGH THE EXTERIOR,
<br /> • MANUALS(C703.6.2)
<br /> • DESIGN DRAWINGS:THESE DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY • RECORD DOCUMENTS(C103.6,1)
<br /> SHOW THE FINAL ROUTING OF DUCTWORK,PIPING OR FINAL LOCATION OF EQUIPMENT. EQUIPMENT AND PIPING IDENTIFICATION INTAKES,EXHAUST OUTLETS,AND RELIEF OUTLETS:DAMPERS TO TO MAINTAIN THE FIRE RESISTANCE RATING OF THE HIGHEST FIRE BARRIER PENETRATED.
<br /> IF3.
<br /> RAT
<br /> CONFLICTS ARISEWHICH CAUSE A CHANGE IN THE SPECIFIED PLANS A DESIGN,THE COMPLIANCE DOCUMENTATION(C103.8.3) COMPLY LN WITH WSEC I SQ FT.A DAMPER LEAKAGE ZS
<br /> THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING THE 1. NAMEPLATES: PROVIDE NAMEPLATE FOR EACH PIECE OF EQUIPMENT,INCLUDING SHALL NOT EXCEED 4 CFM/SQ.FT.AT 1.0"W.G.FOR MOTORIZED 2. IN ALL BUILDINGS MORE THAN ONE STORY IN HEIGHT THE DUCTS SHALL BE ENCLOSED IN A
<br /> CHANGES. ANY CHANGES NOT APPROVED BY THE ENGINEER SHALL BE THE EQUIPMENT NUMBER AND ANY SPECIAL INSTRUCTION FOR ITS USE;LAMINATED BLACK CONTINUOUS ENCLOSURE EXTENDING FROM THE LOWEST FIRE-RATED CEILING OR FLOOR
<br /> 2. TRAINING OF THE MAINTENANCE STAFF FOR EQUIPMENT INCLUDED IN THE MANUALS DAMPERS OR 20 CFM/NMOT.AT 1.0"W.G.FOR SMALLS ORIZED
<br /> AND WHITE PLASTIC WITH LETTERING CUT THROUGH TO WHITE BACKGROUND. ABOVE THE HOOD,THROUGH ANY CONCEALED SPACES.BUILDINGS LESS THAN FOUR
<br /> RESPONSIBILITY OF OTHERS REQUIRED BY SECTION C103.6.25HALL INCLUDE ATA MINIMUM(C103.6.4): DAMPERS, NONMOTORIZED DAMPERS SMALLER THAN 24"
<br /> • REVIEW OF MANUALS AND PERMANENT CERTIFICATE. MINIMUM SIZE 3"X1". IN EITHER DIMENSION WHERE THE MAXIMUM ALLOWABLE LEAKAGE STORIES IN HEIGHT SHALL HAVE AN ENCLOSURE WITH AFIRE RESISTANCE RATING OF NOT PERMIT SET
<br /> • INTERFERENCE'S:THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER CRAFTS TO • HANDS-ON DEMONSTRATION OF ALL NORMAL MAINTENANCE PROCEDURES, RATE IS 40 CFM/SQ.FT. LESS THAN 1 HOUR.BUILDINGS FOUR STORIES OR MORE IN HEIGHT SHALL HAVE AN
<br /> MAKE CERTAIN LOCATIONS AND ARRANGEMENTS REQUIRED FOR INSTALLATION OF NORMAL OPERATING MODES,AND ALL EMERGENCY SHUTDOWN AND START-UP 2. PIPE IDENTIFICATION: ALL PIPING IN SERVICEABLE LOCATIONS(INCLUDING ABOVE ENCLOSURE WITH A FIRE RESISTANCE RATING OF NOT LESS THAN 2 HOURS.THE
<br /> SYSTEMS, ARE MADE AVAILABLE,ET , O AND BE INTERFERE
<br /> H ARRANGING MEMBERS, PROCEDURES.
<br /> LAY-IN CEILINGS) SHALL BE IDENTIFIED WITH SEMI-RIGID PLASTIC OR ADHESIVE ENCLOSURE SHALL BE VENTED TO THE EXTERIOR OF THE BUILDING THROUGH
<br /> PIPING,EQUIPMENT,ETC.,SO AS NOT TO INTERFERE WITH STRUCTURAL MEMBERS, TRAINING COMPLETION REPORT. IDENTIFICATION MARKERS. MARKERS SHALL CONFORM TO ANSI A73.1,"SCHEME FOR 16. ENERGY METERING:METERS ARE PROVIDED FOR ENERGY WEATHER-PROTECTED OPENINGS.SEE IMC.3.6.10 FOR EXCEPTIONS.
<br /> LIGHTS,AND OTHER ITEMS HAVING FIXED LOCATIONS NOT RELATED TO THE SYSTEMS. THE IDENTIFICATION OF PIPING SYSTEMS'. LOCATE MARKERS ADJACENT TO EACH SOURCES AS PER 2018 WSEC C409 INCLUDING 409.3.1 FOR ALL
<br /> WHERE ALTERNATE ROUTING,OFFSETS,AND TRANSITIONS ARE REQUIRED FOR FIELD COMMISSIONING: VALVE,AT MINIMUM 30'CENTERS WITH AT LEAST ONE MARKER BETWEEN ANY TWO HVAC EQUIPMENT WITH THE EXCEPTION OF ENERGY SERVING 3. THE CONTINUOUS ENCLOSURE PROVISIONS SHALL NOT BE REQUIRED WHERE A
<br /> COORDINATION OF ALL TRADES,THE CONTRACTOR SHALL MAKE CHANGES WITHOUT PARTITIONS.PROVIDE DIRECTION OF FLOW ARROWS AT MARKERS. PROCESS LOADS,SERVICE WATER HEATING OR OTHER FIELD-APPLIED GREASE DUCT ENCLOSURE OR A FACTORY-BUILT GREASE DUCT ENCLOSURE
<br /> B ADDITIONAL COSTS. 1. SYSTEM COMMISSIONING IS NOT REQUIRED IF ALL OF THE FOLLOWING EXCEPTIONS MISCELLANEOUS LOADS PER C409.3 IS PROTECTED WITH A LISTED DUCT-THROUGH-PENETRATION PROTECTION SYSTEM B
<br /> ARE MET: MISCELLANEOUS MATERIALS AND ACCESSORIES EQUIVALENT TO THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED,AND
<br /> • VERIFICATION: PRIOR TO ORDERING ANY EQUIPMENT OR FIXTURES, VERIFY WHERE THE MATERIALS ARE.
<br /> DIMENSIONS OF ALL SUCH EQUIPMENT,FIXTURES,ETC.,TO MAKE CERTAIN IT FITS INTO C. MECHANICAL SYSTEM COMMISSIONING IS NOT REQUIRED WHERE THE 1. DIELECTRIC UNIONS:PROVIDE AT EACH PIPE CONNECTION BETWEEN DISSIMILAR 17. ALL HVAC EQUIPMENT SHALL MEET MINIMUM EFFICIENCY
<br /> THE STRUCTURAL AND ARCHITECTURAL FEATURES OF THE BUILDING, AVOIDS BUILDING'S TOTAL MECHANICAL EQUIPMENT CAPACITY IS LESS THAN 240,000 METALS.2 INCHES AND SMALLER,250 PSIG AT 180 DEG.F.,ANSI B16.39.OVER 2"USE REQUIREMENTS INDICATED IN TABLES C403.3.2(1)THROUGH 4. CLEARANCE FROM THE DUCT TO THE INTERIOR SURFACE OF ENCLOSURES OF
<br /> CONFLICT WITH EQUIPMENT OR FIXTURES OF OTHER CRAFTS AND FITS INTO THE BN/H COOLING CAPACITY AND LESS THAN 300,000 BTU/1-1 HEATING CAPACITY. FLANGE FITTINGS,ANSI B16.42(IRON)OR ANSI B16.24(BRONZE),WATTS 3000 SERIES, C403.3.2(12).WHERE MULTIPLE RATING REQUIREMENTS EXIST,THE COMBUSTIBLE CONSTRUCTION SHALL BE NOT LESS THAN 181N.CLEARANCE FROM THE
<br /> i SPACE PROVIDED FOR THE INSTALLATION. EPCO OR EQUIVALENT. EQUIPMENT SHALL SATISFY ALL STATED REQUIREMENTS. DUCT TO THE INTERIOR SURFACE OF ENCLOSURES OF NONCOMBUSTIBLE OR
<br /> 3 D. ELECTRICAL SYSTEM COMMISSIONING IS NOT REQUIRED WHERE THE TOTAL LIMITED-COMBUSTIBLE CONSTRUCTION SHALL BE NOT LESS THAN 6IN.
<br /> Ili • SLEEVES AND INSERTS:THE CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES INSTALLED LIGHTING LOAD IS LESS THAN 20 kW AND THE LIGHTING LOAD 2. FIRE SEALING AT RATED WALLS AND FLOORS:PROVIDE UL LISTED FIRE RATED PUTTY
<br /> AND INSERTS REQUIRED FOR HIS WORK.THE CONTRACTOR SHALL SCHEDULE HIS CONTROLLED BY OCCUPANCY SENSORS OR AUTOMATIC DAYUGHTING AT ALL PIPE PENETRATIONS OF RATED WALLS AND FLOORS.PUTTY SHALL BE 5. CLEARANCE FROM THE OUTER SURFACES OF FIELD-APPLIED GREASE DUCT ENCLOSURES
<br /> oWORK SO HE INSTALLS SLEEVES AND INSERTS AS CONSTRUCTION PROCEEDS AND IN A CONTROLS IS LESS THAN 10 kW. INSTALLED STRICTLY PER MANUFACTURER INSTRUCTIONS WITH SLEEVES WHERE AND FACTORY-BUILT GREASE DUCT ENCLOSURES TO THE INTERIOR SURFACES OF
<br /> 92 MANNER TO AVOID DELAYS. IF THE CONTRACTOR FAILS TO INSTALL SLEEVES AND REQUIRED.OVERALL INSTALLATION SHALL MEET CODE REQUIREMENTS.PIPE CONSTRUCTION INSTALLED AROUND THEM SHALL BE PERMITTED TO BE REDUCED WHERE
<br /> INSERTS AS CONSTRUCTION PROCEEDS,HE SHALL PAY ALL COSTS FOR CUTTING AND E. SERVICE WATER HEATING SYSTEMS ARE EXEMPT FROM THE COMMISSIONING INSULATION SHALL NOT BE CONTINUOUS THROUGH FIRE RATED WALLS OR FLOORS. THE FIELD-APPLIED GREASE DUCT ENCLOSURE MATERIALS AND FACTORY-BUILT GREASE
<br /> Ps PATCHING TO MAKE THE PROPER INSTALLATION. PROCESS IN BUILDINGS WHERE THE LARGEST SERVICE WATER HEATING DUCT ENCLOSURES ARE INSTALLED IN ACCORDANCE WITH THE CONDITIONS OF THE LISTING
<br /> 9.4 SYSTEM CAPACITY IS LESS THAN 200.000 BTU/H AND WHERE THERE ARE NO 3. FIRE STOP SYSTEMS SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S AND MANUFACTURER'S INSTRUCTIONS AND ARE ACCEPTABLE TO THE AUTHORITY HAVING REV DATE DESCRIPTION
<br /> • CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY SYSTEMS/SERVICESPOOLS OR PERMANENT SPAS. SPECIFICATIONS;TRAINING RECORDS/CERTIFICATIONS OF INSTALLERS MAYBE JURISDICTION.
<br /> WITHOUT FIRST COORDINATING ALL DOWNTIME WITH OWNER'S PERSONNEL REQUIRED AT TIME OF INSPECTIONS.PENETRATIONS THROUGH RATED FIRE WALLS
<br /> CONTRACTOR SHALL PROVIDE A DETAILED M.O.P.AS REQUIRED.DO NOT BEGIN WORK F. NO SYSTEMS ARE INSTALLED TO MEET SECTION C406 OR C407 INCLUDING AND CEILINGS SHALL BE SEALED UPON COMPLETION OF WORK AND ALL PENETRATIONS PROJ.NO. 221999
<br /> o WITHOUT WRITTEN APPROVAL EQUIPMENT,CONTROLS,OR CONFIGURATION SETTINGS FOR MECHANICAL, SHALL BE LABELED.IFC 703.2(2018 EDITION)AND NFPA 80. -
<br /> X SERVICE WATER HEATING, ELECTRICAL POWER OR LIGHTING SYSTEMS DRAWN NH
<br /> • SUBMITTALS: SUBMIT PRODUCT DATA AND SHOP DRAWINGS FOR ALL SIGNIFICANT WHICH ARE INCLUDED IN THE PROJECT TO COMPLY WITH SECTION C406 OR 4. MOTORS:UNLESS OTHERWISE SPECIFIED,ALL ELECTRIC MOTORS FURNISHED SHALL
<br /> " MATERIALS,EQUIPMENT,AND FIXTURES TO THE NE FOR REVIEWALLOW Q407. CONFORM WITH THE REQUIREMENTS OFNEMAMGI'MOTORS AND GENERATORS'. CHECKED TB
<br /> REASONABLE TIME FOR REVIEW AND RETURN PRIOR TO ORDERING.PDF(ELECTRONIC) PROVIDE MINIMUM MOTOR EFFICIENCIES AS REQUIRED BY THE ENERGY CODE. •
<br /> SUBMITTALS AREA ACCEPTABLE,IF PAPER COPIES ARE SUBMITTED ASSUME OWNER G. ENERGY METERING SYSTEM COMMISSIONING IS NOT REQUIRED WHERE DATE 08/24/2022
<br /> AND NE WILL RETAIN A TOTAL OF THREE COPIES OF SUBMITTALS- EITHER THE TENANT SPACES SMALLER THAN 50,000 SQ. FT. WITHIN 5. INTERCONNECTING WIRING:PROVIDE ANY NECESSARY INTERCONNECTING WIRING
<br /> BUILDINGS IF THE TENANT SPACE HAS ITS OWN UTILITY SERVICE AND UTILITY BETWEEN INDIVIDUAL COMPONENTS AND ACCESSORIES FURNISHED WITH
<br /> • SAFETY MEASURES: PROVIDE A SAFE ENVIRONMENT TO PROTECT EMPLOYEES AND METERS OR BUILDINGS IN WHICH THERE IS NO GROSS CONDITIONED FLOOR MECHANICAL EQUIPMENT PACKAGES(UNLESS THAT WIRING IS SPECIFICALLY CALLED ©COFFMAN ENGINEERS INC.
<br /> ALL OTHERS FROM INJURY. COMPLY WITH LOCAL,STATE AND FEDERAL SAFETY AND AREA OVER 25,000 SQUARE FEET,INCLUDING BUILDING COMMON AREA,THAT FOR ON THE ELECTRICAL DRAWINGS).WIRING AND WIRING ACCESSORIES SHALL BE IN
<br /> HEALTH REGULATIONS FOR CONSTRUCTION. IS SERVED BY ITS OWN UTILITY SERVICES AND METERS. ACCORDANCE WITH DIVISION 26 SPECIFICATIONS(AND/OR THE SPECIFICATIONS ON SHEET TITLE:
<br /> THE ELECTRICAL DRAWINGS)AND LOCAL ELECTRICAL CODE.WIRING SHALL BE IN
<br /> o EXISTING BUILDINGS 2. FOR. MECHANICAL SYSTEMS THAT DO NOT MEET THE EXCEPTIONS LISTED ABOVE, CONDUIT OR RACEWAY.WIRING SHALL BE PROVIDED AT THE EXPENSES OF THE p/�
<br /> PROVIDE COMMISSIONING COMPLIANT WITH SECTION C408 OF THE 2018 WSEC. SUBCONTRACTOR FURNISHING THE EQUIPMENT PACKAGE - GENERAL
<br /> CONTINUITY F SERVICE: ANY SYSTEMS AN OR SERVICES SHALLPI BE ITHTAIE D WITH COMMISSIONING TO INCLUDE: 6. FLEXIBLE CONNECTORS:PROVIDE FLEXIBLE CONNECTORS AT FANS AND EQUIPMENT SPECIFICATIONS
<br /> MINIMUM INTERRUPTION. COORDINATE ANY NEEDED INTERRUPTIONS WITH THE OWNER. THAT DO NOT HAVE INTERNAL VIBRATION ISOLATION.INDOOR:UL LISTED HYPOLON•'-' ANY OVERTIME WORK REQUIRED BY THIS PROJECT TO MAINTAIN EXISTING BUILDINGS IN A VERIFICATION OF HVAC SYSTEM AIR CONDITIONING AND HEATING FUNCTION. COATED GLASS FABRIC OR NEOPRENE COATED NYLON FABRIC.FLAME RESISTANT
<br /> wCONTINUOUS SERVICE,WITHOUT REDUCING THEIR EFFICIENCY,SHALL BE INCLUDED AS T0250 F.24 OZ/SQ.YD.DURODYNE"NEOPRENE"OR ELGEN'HYPOLON". A
<br /> A PART OF THIS CONTRACT. B. FOR AHU WITH IN-LINE CONDENSER COIL,VERIFICATION OF HVAC SYSTEM -
<br /> o DEHUMIDIFICATION FUNCTION 7. DUCT ACCESS DOORS:PROVIDE IN SUFFICIENT QUANTITY,LOCATIONS,AND SIZES TO
<br /> DEMOLITION:PROVIDE MECHANICAL SYSTEM DEMOLITION IN AREAS OF EXISTING PROVIDE PROPER ACCESS TO DAMPERS AND EQUIPMENT THAT MAY REQUIRE
<br /> g BUILDINGS TO ACCOMMODATE INSTALLATION OF NEW WORK EXISTING PIPING,VALVES, C. MOTOR AMPERAGE AND AIRFLOW READING TO BE TAKEN DURING HVAC SERVICE.VENTLOCK WITH PIANO HINGE AND/OR CAM LATCHES.SUPPLY DUCT
<br /> _ AND DUCTWORK WHERE INDICATED ON THE DRAWING,MAY BE REUSED IN THEIR ORIGINAL SYSTEM TESTING. ACCESS DOORS SHALL BE DOUBLE WALL,WITH 1"INSULATION.
<br /> LOCATION.DO NOT REUSE EXISTING PIPING,VALVES,OR DUCTWORK ONCE THEY ARE
<br /> REMOVED,UNLESS WRITTEN PERMISSION IS OBTAINED FROM OWNER.REMOVE ALL 3. IT HAS BEEN DETERMINED THAT COMMISSIONING IS NOT REQUIRED FOR THE 8. VOLUME DAMPERS:BALANCING DAMPERS SHALL BE PER SMACNA STANDARDS.HEAVY
<br /> UNUSED PIPING AND DUCTWORK LOCATED IN REMODEL AREAS OF EXISTING BUILDINGS. DUTY QUADRANTS WITH SETTING SCALE AND SECURE LOCKING THUMB NUTS.
<br /> E. MECHANICAL SYSTEMS ON THIS PROJECT.
<br /> W CUTTING AND PATCHING: PROVIDE ALL CUTTING OF BUILDING CONSTRUCTION,AS
<br /> g REQUIRED FOR THIS WORK KEEP CUTTING TOA MINIMUM, AND USE SAW CUTTING TO SHEET NO:
<br /> MAINTAIN NEAT,EVEN OPENINGS.UNLESS PATCHING IS INCLUDED UNDER OTHER DIVISIONS
<br /> ' OF THIS SPECIFICATION,PROVIDE PATCHING AT ALL CUTTING LOCATIONS.ALL PATCHING /�0.
<br /> o SHALL CONFORM TO SPECIFICATIONS FOR THE NEW GENERAL CONSTRUCTION WORK I\V/I
<br /> FINISH TO MATCH EXISTING.
<br /> M
<br /> a SHEET OF XXX