My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-84 May 6, 2025 <br /> <br />The type of rollers to be used and their relative position in the compaction sequence 1 <br />shall generally be the Contractor’s option, provided the specified densities are attained. 2 <br />Unless the Engineer has approved otherwise, rollers shall only be operated in the static 3 <br />mode when the internal temperature of the mix is less than 175°F. Regardless of mix 4 <br />temperature, a roller shall not be operated in a mode that results in checking or cracking 5 <br />of the mat. Rollers shall only be operated in static mode on bridge decks. 6 <br /> 7 <br />5-04.3(10)B HMA Compaction - Cyclic Density 8 <br />Low cyclic density areas are defined as spots or streaks in the pavement that are less 9 <br />than 90 percent of the theoretical maximum density. At the Engineer’s discretion, the 10 <br />Engineer may evaluate the HMA pavement for low cyclic density, and when doing so will 11 <br />follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for 12 <br />any 500-foot section with two or more density readings below 90 percent of the 13 <br />theoretical maximum density. 14 <br /> 15 <br />5-04.3(10)C Vacant 16 <br /> 17 <br />5-04.3(10)D HMA Nonstatistical Compaction 18 <br /> 19 <br />5-04.3(10)D1 HMA Nonstatistical Compaction - Lots and Sublots 20 <br />HMA compaction which is accepted by nonstatistical evaluation will be based on 21 <br />acceptance testing performed by the Contracting Agency dividing the project into 22 <br />compaction lots. 23 <br /> 24 <br />A lot is represented by randomly selected samples of the same mix design that will be 25 <br />tested for acceptance. A lot is defined as the total quantity of material or work produced 26 <br />for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be 27 <br />equal to one day’s production or 400 tons, whichever is less except that the final sublot 28 <br />will be a minimum of 200 tons and may be increased to 800 tons. Testing for compaction 29 <br />will be at the rate of 5 tests per sublot per WSDOT T 738. 30 <br /> 31 <br />The sublot locations within each density lot will be determined by the Engineer. For a lot 32 <br />in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request 33 <br />after the Engineer is satisfied that material conforming to the Specifications can be 34 <br />produced. 35 <br /> 36 <br />HMA mixture accepted by commercial evaluation and HMA constructed under conditions 37 <br />other than those listed above shall be compacted on the basis of a test point evaluation 38 <br />of the compaction train. The test point evaluation shall be performed in accordance with 39 <br />instructions from the Engineer. The number of passes with an approved compaction 40 <br />train, required to attain the maximum test point density, shall be used on all subsequent 41 <br />paving. 42 <br /> 43 <br />HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel 44 <br />ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the 45 <br />Engineer. 46 <br /> 47
The URL can be used to link to this page
Your browser does not support the video tag.