Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-86 May 6, 2025 <br /> <br />the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater 1 <br />than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting 2 <br />Agency. If the material is rejected before placement and the CPF is greater than or equal 3 <br />to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection 4 <br />occurs after placement and the CPF is greater than or equal to 0.75, compensation for 5 <br />the rejected material will be at the calculated CPF with an addition of 25 percent of the 6 <br />unit Contract price added for the cost of removal and disposal. 7 <br /> 8 <br />5-04.3(11)D Rejection - A Partial Sublot 9 <br />In addition to the random acceptance sampling and testing, the Engineer may also 10 <br />isolate from a normal sublot any material that is suspected of being defective in relative 11 <br />density, gradation or asphalt binder content. Such isolated material will not include an 12 <br />original sample location. A minimum of three random samples of the suspect material will 13 <br />be obtained and tested. The material will then be statistically evaluated as an 14 <br />independent lot in accordance with Section 1-06.2(2). 15 <br /> 16 <br />5-04.3(11)E Rejection - An Entire Sublot 17 <br />An entire sublot that is suspected of being defective may be rejected. When a sublot is 18 <br />rejected a minimum of two additional random samples from this sublot will be obtained. 19 <br />These additional samples and the original sublot will be evaluated as an independent lot 20 <br />in accordance with Section 1-06.2(2). 21 <br /> 22 <br />5-04.3(11)F Rejection - A Lot in Progress 23 <br />The Contractor shall shut down operations and shall not resume HMA placement until 24 <br />such time as the Engineer is satisfied that material conforming to the Specifications can 25 <br />be produced: 26 <br /> 27 <br />1. When the CPF of a lot in progress drops below 1.00 and the Contractor is taking 28 <br />no corrective action, or 29 <br />2. When the Pay Factor (PF) for any constituent of a lot in progress drops below 30 <br />0.95 and the Contractor is taking no corrective action, or 31 <br />3. When either the PF for any constituent or the CPF of a lot in progress is less than 32 <br />0.75. 33 <br /> 34 <br />5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction) 35 <br />An entire lot with a CPF of less than 0.75 will be rejected. 36 <br /> 37 <br />5-04.3(12) Joints 38 <br /> 39 <br />5-04.3(12)A HMA Joints 40 <br /> 41 <br />5-04.3(12)A1 Transverse Joints 42 <br />The Contractor shall conduct operations such that the placing of the top or wearing 43 <br />course is a continuous operation or as close to continuous as possible. Unscheduled 44 <br />transverse joints will be allowed, and the roller may pass over the unprotected end of the 45 <br />freshly laid mixture only when the placement of the course must be discontinued for such 46 <br />a length of time that the mixture will cool below compaction temperature. When the Work 47
The URL can be used to link to this page
Your browser does not support the video tag.