My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-92 May 6, 2025 <br /> <br /> 1 <br />3. Haul routes from supplier facilities, and locations of temporary parking and 2 <br />staging areas, including return routes. Describe the complete round trip as it 3 <br />relates to the sequencing of paving operations. 4 <br /> 5 <br />4. Names and locations of HMA supplier facilities to be used. 6 <br /> 7 <br />5. List of all equipment to be used for paving. 8 <br /> 9 <br />6. List of personnel and associated job classification assigned to each piece of 10 <br />paving equipment. 11 <br /> 12 <br />7. Description (geometric or narrative) of the scheduled sequence of planing and of 13 <br />paving and intended area of planing and of paving for each day’s work, must 14 <br />include the directions of proposed planing and of proposed paving, sequence of 15 <br />adjacent lane paving, sequence of skipped lane paving, intersection planing and 16 <br />paving scheduling and sequencing, and proposed notifications and coordinations 17 <br />to be timely made. The plan must show HMA joints relative to the final pavement 18 <br />marking lane lines. 19 <br /> 20 <br />8. Names, job titles, and contact information for field, office, and plant supervisory 21 <br />personnel. 22 <br /> 23 <br />9. A copy of the approved Mix Designs. 24 <br /> 25 <br />10. Tonnage of HMA to be placed each day. 26 <br /> 27 <br />11. Approximate times and days for starting and ending daily operations. 28 <br /> 29 <br />5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing 30 <br />At least 2 Working Days before the first paving operation and the first planing operation, 31 <br />or as scheduled by the Engineer for future paving and planing operations to ensure the 32 <br />Contractor has adequately prepared for notifying and coordinating as required in the 33 <br />Contract, the Contractor must be prepared to discuss that day’s operations as they relate 34 <br />to other entities and to public safety and convenience, including driveway and business 35 <br />access, garbage truck operations, transit operations and working around energized 36 <br />overhead wires, school and nursing home and hospital and other accesses, other 37 <br />Contractors who may be operating in the area, pedestrian and bicycle traffic, and 38 <br />emergency services. The Contractor, and Subcontractors that may be part of that day’s 39 <br />operations, must meet with the Engineer and discuss the proposed operation as it 40 <br />relates to the submitted planing plan and paving plan, approved traffic control plan, and 41 <br />public convenience and safety. Such discussion includes, but is not limited to: 42 <br /> 43 <br />1. General for both the Paving and Planing: 44 <br /> 45 <br />a. The actual times of starting and ending daily operations. 46
The URL can be used to link to this page
Your browser does not support the video tag.