My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-107 May 6, 2025 <br /> <br />The Communication board shall be integrated with the TI BPL2 EDGE card 1 <br />and fit directly into NEMA TS1 & TS2 type racks as well as Type 170/2070 2 <br />input files. 3 <br /> 4 <br />9-29.18(3)B Functional Capabilities 5 <br /> 6 <br />Real Time Detection of vehicles and bicycles using the roadway. Bicycles 7 <br />using the roadway can be detected regardless of which lane they are using 8 <br />even if vehicle traffic is present. Bicycles detected can have a separate output 9 <br />to allow bikes a pre-call or a longer minimum green. 10 <br /> 11 <br />The TI BPL2 EDGE system shall be expandable up to 8 FLIR sensors that 12 <br />may be programmed independently. Up to four (4) TI BPL2 EDGE cards may 13 <br />be used if more than 8 sensors are necessary – up to 32 FLIR sensors. 14 <br /> 15 <br />The system shall be capable of displaying detection zones on the thermal 16 <br />image with associated outputs. Outputs/Inputs status will be indicated on the 17 <br />screen. Parameters will also include the ability to view raw video without any 18 <br />verbiage and/or detectors for surveillance purposes. Signal phasing can also 19 <br />be displayed in a NEMA TS2-1 cabinet with an accompanied PIM Module and 20 <br />SDLC interface (optional). 21 <br /> 22 <br /> 23 <br />Each thermal traffic detector will detect within its view the presence of 24 <br />vehicles or bicycles in user defined zones. Detectors available shall be 25 <br />presence, count, delay, extension, or pulse mode for either arrival or 26 <br />departure of vehicles. Delay and extension shall be defined between 0.1 – 27 <br />99.9 seconds and pulse mode between 0 – 200ms in 33ms increments if 28 <br />NTSC is used. Each thermal traffic sensor shall also detect and collect traffic 29 <br />data of passing vehicles in user-defined zones. 30 <br /> 31 <br />Collected traffic data by direction shall include: 32 <br /> 33 <br />· Volume (absolute numbers) per length class and per lane. 34 <br />· Average speed (km/h or mph) per length class and per lane. 35 <br />· Average gap time (1/10 sec) per length class and per lane. 36 <br />· Average headway (m or feet) per lane. 37 <br />· Occupancy (%) per lane 38 <br />· Confidence (0-10) depending on Thermal Quality of Image 39 <br />· Density (Vehicles / KM) Number of Vehicles over distance 40 <br /> 41 <br />Once an IP address is set up the thermal traffic detector shall be programmed 42 <br />with the use of a computer or network connection. A standard computer 43 <br />running a web browser is necessary. 44 <br /> 45
The URL can be used to link to this page
Your browser does not support the video tag.