My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-118 May 6, 2025 <br /> <br />(******) 1 <br />Contractor Surveying – Roadway Striping and Channelization 2 <br /> 3 <br />No survey control data or layout will be furnished by the Contracting Agency. 4 <br />The Contractor shall be solely responsible for detailed documentation (records) 5 <br />of all existing pavement markings and channelization in the field prior to grinding 6 <br />operations. This work includes but is not limited to: field notes, sketches, offset 7 <br />markings on curbs or staking if no curb exists. 8 <br /> 9 <br />The records and offset marking/staking shall be adequate to allow the pavement 10 <br />markings to be reproduced to a level of accuracy shown below: 11 <br /> 12 <br />Lane widths ±0.1 feet (normal to alignment) 13 <br />Longitudinal location of arrows and letters ±1.0 feet (parallel to alignment) 14 <br />Longitudinal location of stop lines ±1.0 feet (parallel to alignment) 15 <br />Transverse location of arrows and letters ±0.1 feet (normal to alignment) 16 <br />Longitudinal location of transitions and tapers ±1.0 feet (parallel to alignment) 17 <br />Pavement marking starts and stops ±1.0 feet (parallel to alignment) 18 <br /> 19 <br />The Contractor shall provide copies of any calculations, notes, and layout data 20 <br />to the Engineer, or their assigned representative, prior to grinding. The 21 <br />Contracting Agency will review the provided data, check the existing layout and 22 <br />provide revisions as necessary for establishment of lane widths, arrow and letter 23 <br />locations, tapers, transitions, other modifications, and pavement seams. The 24 <br />Contracting Agency will require up to seven calendar days from the date the 25 <br />data is received to conduct this review. No pavement grinding will be allowed 26 <br />before this review is complete. The Contractor will make adjustments to the curb 27 <br />marking and stakes to match the revisions prior to grinding. 28 <br /> 29 <br />Based on these records and/or the offset staking, the Contractor shall perform 30 <br />all field marking and preliminary spotting for all pavement marking and 31 <br />channelization following grinding operations, for temporary only. The 32 <br />Contracting Agency shall perform all field marking for permanent pavement 33 <br />marking and channelization. All calculations, surveying, and measuring required 34 <br />for setting and maintaining the necessary lines for the temporary pavement 35 <br />marking shall be the Contractor's responsibility. 36 <br /> 37 <br />Preliminary spotting shall be provided at a spacing of 40 foot maximum on 38 <br />tangents and 25 foot maximum on curves and tapers. All curves, tapers, stop 39 <br />lines, and crosswalks shall be laid out with a rope. Field layout for curves and 40 <br />tapers shall use an 800’ minimum length rope. The color of the material used 41 <br />for preliminary spotting shall be white. Longitudinal marking shall be parallel 42 <br />with the proposed line applied with a paint marker wand or other approved 43 <br />method, a minimum of 6 inches in length and wide enough so that a minimum 44 <br />of two marks can be clearly seen at night under ordinary headlight conditions. 45 <br />Refreshing of marks prior to striping shall be the responsibility of the Contractor. 46 <br /> 47 <br />Personnel performing the field layout and preliminary spotting shall be proficient 48 <br />in the practice of striping layout, including layout and preliminary spotting of 49 <br />curves and tapers using a rope and paint wand, proper annotation on the 50 <br />pavement of starts, stops, and changes in line type for pavement markings, and 51
The URL can be used to link to this page
Your browser does not support the video tag.