My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-121 May 6, 2025 <br /> <br />GKK 8-26.DOCX 1 <br />8-26 RESOLVE ABOVE GROUND CONFLICTS 2 <br />(******) 3 <br /> 4 <br />Section 8-26 is vacant and is replaced with the following: 5 <br /> 6 <br />8-26.1 Description 7 <br /> 8 <br />This work consists of resolving unanticipated above ground conflicts to conform to the 9 <br />Project requirements due to construction, where they are not addressed by the 10 <br />Construction Plans and Details. This bid item may be used to construct or modify items 11 <br />which are not identified, nor addressed in the Plans and Details. 12 <br /> 13 <br />8-26.2 Vacant 14 <br /> 15 <br />8-26.3 Construction Requirements 16 <br /> 17 <br />As directed by Engineer, address and resolve underground conflicts that need 18 <br />modification to accommodate construction. 19 <br /> 20 <br />8-26.4 Vacant 21 <br /> 22 <br />8-26.5 Payment 23 <br /> 24 <br />“Resolved unanticipated conflicts” Force Account, as provided in Section 1-09.6. 25 <br /> 26 <br />To provide a common Proposal for all Bidders, the Contracting Agency has entered an 27 <br />amount in the Proposal to become a part of the Contractor’s total Bid. 28 <br /> 29 <br /> 30 <br />END DIVISION8.RTF 31 <br /> 32 <br />END DIVISION 8 33 <br /> 34 <br /> 35
The URL can be used to link to this page
Your browser does not support the video tag.