Laserfiche WebLink
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-3 May 6, 2025 <br /> <br />All references to the terms “State” or “state” shall be revised to read “Contracting 1 <br />Agency” unless the reference is to an administrative agency of the State of Washington, 2 <br />a State statute or regulation, or the context reasonably indicates otherwise. 3 <br /> 4 <br />All references to “State Materials Laboratory” shall be revised to read “Contracting 5 <br />Agency designated location”. 6 <br /> 7 <br />All references to “final contract voucher certification” shall be interpreted to mean the 8 <br />Contracting Agency form(s) by which final payment is authorized, and final completion 9 <br />and acceptance granted. 10 <br /> 11 <br />Additive 12 <br />A supplemental unit of work or group of bid items, identified separately in the Bid 13 <br />Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 14 <br />to the base bid. 15 <br /> 16 <br />Alternate 17 <br />One of two or more units of work or groups of bid items, identified separately in the Bid 18 <br />Proposal, from which the Contracting Agency may make a choice between different 19 <br />methods or material of construction for performing the same work. 20 <br /> 21 <br />Business Day 22 <br />A business day is any day from Monday through Friday except holidays as listed in 23 <br />Section 1-08.5. 24 <br /> 25 <br />Contract Bond 26 <br />The definition in the Standard Specifications for “Contract Bond” applies to whatever 27 <br />bond form(s) are required by the Contract Documents, which may be a combination of a 28 <br />Payment Bond and a Performance Bond. 29 <br /> 30 <br />Contract Documents 31 <br />See definition for “Contract”. 32 <br /> 33 <br />Contract Time 34 <br />The period of time established by the terms and conditions of the Contract within which 35 <br />the Work must be physically completed. 36 <br /> 37 <br />Notice of Award 38 <br />The written notice from the Contracting Agency to the successful Bidder signifying the 39 <br />Contracting Agency’s acceptance of the Bid Proposal. 40 <br /> 41 <br />Notice to Proceed 42 <br />The written notice from the Contracting Agency or Engineer to the Contractor authorizing 43 <br />and directing the Contractor to proceed with the Work and establishing the date on which 44 <br />the Contract time begins. 45 <br /> 46 <br />Traffic 47 <br />Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 48 <br />equestrian traffic. 49 <br /> 50