My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-10 May 6, 2025 <br /> <br />1-02.10.RTF 1 <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal 2 <br />(July 23, 2015 APWA GSP) 3 <br /> 4 <br />Delete this section, and replace it with the following: 5 <br /> 6 <br />After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may 7 <br />withdraw, revise, or supplement it if: 8 <br /> 9 <br />1. The Bidder submits a written request signed by an authorized person and 10 <br />physically delivers it to the place designated for receipt of Bid Proposals, and 11 <br />2. The Contracting Agency receives the request before the time set for receipt of 12 <br />Bid Proposals, and 13 <br />3. The revised or supplemented Bid Proposal (if any) is received by the Contracting 14 <br />Agency before the time set for receipt of Bid Proposals. 15 <br /> 16 <br />If the Bidder’s request to withdraw, revise, or supplement its Bid Proposal is received 17 <br />before the time set for receipt of Bid Proposals, the Contracting Agency will return the 18 <br />unopened Proposal package to the Bidder. The Bidder must then submit the revised or 19 <br />supplemented package in its entirety. If the Bidder does not submit a revised or 20 <br />supplemented package, then its bid shall be considered withdrawn. 21 <br /> 22 <br />Late revised or supplemented Bid Proposals or late withdrawal requests will be date 23 <br />recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed 24 <br />requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. 25 <br /> 26 <br />1-02.13.RTF 27 <br />1-02.13 Irregular Proposals 28 <br />(September 3, 2024 APWA GSP) 29 <br /> 30 <br />Delete this section and replace it with the following: 31 <br /> 32 <br />1. A Proposal will be considered irregular and will be rejected if: 33 <br />a. The Bidder is not prequalified when so required; 34 <br />b. The Bidder adds provisions reserving the right to reject or accept the Award, 35 <br />or enter into the Contract; 36 <br />c. A price per unit cannot be determined from the Bid Proposal; 37 <br />d. The Proposal form is not properly executed; 38 <br />e. The Bidder fails to submit or properly complete a subcontractor list (WSDOT 39 <br />Form 271-015), if applicable, as required in Section 1-02.6; 40 <br />f. The Bidder fails to submit or properly complete a Disadvantaged Business 41 <br />Enterprise Certification (WSDOT Form 272-056), if applicable, as required in 42 <br />Section 1-02.6; 43 <br />g. The Bidder fails to submit Written Confirmations (WSDOT Form 422-031) 44 <br />from each DBE firm listed on the Bidder’s completed DBE Utilization 45 <br />Certification that they are in agreement with the bidder’s DBE participation 46 <br />commitment, if applicable, as required in Section 1-02.6, or if the written 47 <br />confirmation that is submitted fails to meet the requirements of the Special 48 <br />Provisions; 49 <br />h. The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, 50 <br />as required in Section 1-02.6, or if the documentation that is submitted fails to 51
The URL can be used to link to this page
Your browser does not support the video tag.