My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-9 May 6, 2025 <br /> <br />· DBE Bid Item Breakdown 1 <br />Proposals that are received as required will be publicly opened and read as specified in 2 <br />Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that 3 <br />is received after the time specified in the Call for Bids for receipt of Bid Proposals or 4 <br />received in a location other than that specified in the Call for Bids. The Contracting 5 <br />Agency will not open or consider any “Supplemental Information” (Written Confirmations 6 <br />Documents, or GFE Documentation) that is received after the time specified, or received 7 <br />in a location other than that specified in the Call for Bids. 8 <br />If an emergency or unanticipated event interrupts normal work processes of the 9 <br />Contracting Agency so that Proposals cannot be received at the office designated for 10 <br />receipt of bids as specified in Section 1-02.12 the time specified for receipt of the 11 <br />Proposal will be deemed to be extended to the same time of day specified in the 12 <br />solicitation on the first work day on which the normal work processes of the Contracting 13 <br />Agency resume. 14 <br />Supplemental bid information submitted after the Proposal submittal but within 48 hours 15 <br />of the time specified for receipt of Proposals, shall be submitted in a sealed envelope 16 <br />labeled the same as for the Proposal, with “Supplemental Information” added. 17 <br />DBE DOCUMENT SUBMITTAL REQUIREMENTS 18 <br />DBE Utilization Certification (WSDOT Form 272-056) 19 <br />The DBE Utilization Certification shall be received at the same location and no later than 20 <br />the time required for delivery of the Proposal. The Contracting Agency will not open or 21 <br />consider any Proposal when the DBE Utilization Certification is received after the time 22 <br />specified for receipt of Proposals or received in a location other than that specified for 23 <br />receipt of Proposals. The DBE Utilization Certification may be submitted in the same 24 <br />envelope as the Bid deposit. 25 <br />DBE Written Confirmation Document (WSDOT Form 422-031) and/or GFE 26 <br />Documentation, (if applicable) 27 <br />The DBE Written Confirmation Documents and/or GFE Documentation are not required 28 <br />to be submitted with the Proposal. The DBE Written Confirmation Document(s) and/or 29 <br />GFE Documentation (if applicable) shall be received either with the Bid Proposal or as a 30 <br />Supplement to the Bid. Written Confirmation and/or GFE Documentation shall be 31 <br />received no later than 48 hours (not including Saturdays, Sundays and Holidays) after 32 <br />the time for delivery of the Proposal. To be considered responsive, Bidders shall submit 33 <br />a Written Confirmation Document from each DBE firm listed on the Bidder’s completed 34 <br />DBE Utilization Certification and/or the GFE Documentation as required by Section 1-35 <br />02.6. 36 <br />DBE Bid Item Breakdown Form (WSDOT Form 272-054) 37 <br />The DBE Bid Item Breakdown shall be received either with the Bid Proposal or as a 38 <br />Supplement to the Bid. The documents shall be received no later than 48 hours (not 39 <br />including Saturdays, Sundays and Holidays) after the time for delivery of the Proposal. To 40 <br />be considered responsive, Bidders shall submit a completed DBE Bid Item Breakdown, 41 <br />however, the Contractor may correct minor errors to the DBE Bid Item Breakdown for a 42 <br />period up to five calendar days after bid opening (not including Saturdays, Sundays and 43 <br />Holidays). DBE Bid Item Breakdowns that are still incorrect after the correction period will 44 <br />be determined to be non-responsive. 45 <br />The DBE Bid Item Breakdown will not be included as part of the executed Contract. 46 <br /> 47
The URL can be used to link to this page
Your browser does not support the video tag.