My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-15 May 6, 2025 <br /> <br />1-04.2.RTF 1 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 2 <br />Specifications, and Addenda 3 <br />(December 30, 2022 APWA GSP) 4 <br /> 5 <br />Revise the second paragraph to read: 6 <br /> 7 <br />Any inconsistency in the parts of the contract shall be resolved by following this order of 8 <br />precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 9 <br />1. Addenda, 10 <br />2. Proposal Form, 11 <br />3. Special Provisions, 12 <br />4. Contract Plans, 13 <br />5. Standard Specifications, 14 <br />6. Contracting Agency’s Standard Plans or Details (if any), and 15 <br />7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 16 <br /> 17 <br />1-04.4.RTF 18 <br />1-04.4 Changes 19 <br />(January 19, 2022 APWA GSP) 20 <br /> 21 <br />The first two sentences of the last paragraph of Section 1-04.4 are deleted. 22 <br /> 23 <br />1-05.GR1 24 <br />Control of Work 25 <br /> 26 <br />1-05.1.GR1 27 <br />Authority of the Engineer 28 <br /> 29 <br />1-05.1(2).GR1 30 <br />Requests for Information (RFI) 31 <br /> 32 <br />1-05.1(2).INST1.GR1 33 <br />The fourth paragraph of Section 1-05.1(2) is revised to read: 34 <br /> 35 <br />1-05.1(2).OPT1.2026.GR1 36 <br />(November 4, 2024) 37 <br />The Contractor may submit a RFI for one of the following reasons: 38 <br /> 39 <br />1. The Contractor believes there is information missing from the Contract 40 <br />Documents (Missing Information). 41 <br /> 42 <br />2. The Contractor believes a clarification of one or more of the Contract 43 <br />requirements is necessary (Clarification). 44 <br /> 45 <br />3. The Contractor needs to substitute a material that provides an equal or 46 <br />better level of performance as the one specified in the Contract (RFC - 47 <br />Material Substitution). Requests shall indicate the location(s), quantity, and 48 <br />shall describe how the material provides an equal or better level of 49 <br />performance as the material originally specified. 50 <br /> 51
The URL can be used to link to this page
Your browser does not support the video tag.