My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-16 May 6, 2025 <br /> <br />4. The Contractor requests a change to the Contract requirements for a 1 <br />reason other than one listed in items 1-3 of this Section (RFC - Other). To 2 <br />be considered, the request must not meet the requirements of a Value 3 <br />Engineering Change Proposal. To be considered, the request shall qualify 4 <br />as a Minor Change in accordance with Section 1-04.4(1) and shall describe 5 <br />how the change is beneficial to the project. 6 <br /> 7 <br />1-05.7.RTF 8 <br />1-05.7 Removal of Defective and Unauthorized Work 9 <br />(October 1, 2005 APWA GSP) 10 <br /> 11 <br />Supplement this section with the following: 12 <br /> 13 <br />If the Contractor fails to remedy defective or unauthorized work within the time specified 14 <br />in a written notice from the Engineer, or fails to perform any part of the work required by 15 <br />the Contract Documents, the Engineer may correct and remedy such work as may be 16 <br />identified in the written notice, with Contracting Agency forces or by such other means as 17 <br />the Contracting Agency may deem necessary. 18 <br /> 19 <br />If the Contractor fails to comply with a written order to remedy what the Engineer 20 <br />determines to be an emergency situation, the Engineer may have the defective and 21 <br />unauthorized work corrected immediately, have the rejected work removed and replaced, 22 <br />or have work the Contractor refuses to perform completed by using Contracting Agency 23 <br />or other forces. An emergency situation is any situation when, in the opinion of the 24 <br />Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk 25 <br />of loss or damage to the public. 26 <br /> 27 <br />Direct or indirect costs incurred by the Contracting Agency attributable to correcting and 28 <br />remedying defective or unauthorized work, or work the Contractor failed or refused to 29 <br />perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from 30 <br />monies due, or to become due, the Contractor. Such direct and indirect costs shall 31 <br />include in particular, but without limitation, compensation for additional professional 32 <br />services required, and costs for repair and replacement of work of others destroyed or 33 <br />damaged by correction, removal, or replacement of the Contractor’s unauthorized work. 34 <br /> 35 <br />No adjustment in contract time or compensation will be allowed because of the delay in 36 <br />the performance of the work attributable to the exercise of the Contracting Agency’s 37 <br />rights provided by this Section. 38 <br /> 39 <br />The rights exercised under the provisions of this section shall not diminish the 40 <br />Contracting Agency’s right to pursue any other avenue for additional remedy or damages 41 <br />with respect to the Contractor’s failure to perform the work as required. 42 <br /> 43 <br /> 44
The URL can be used to link to this page
Your browser does not support the video tag.