My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-21 May 6, 2025 <br /> <br /> 1 <br />e. Optical fiber including all manufacturing processes, from the initial preform 2 <br />fabrication stage, though the completion of the draw; 3 <br /> 4 <br />f. Lumber including all manufacturing processes, from initial debarking through 5 <br />treatment and planing; 6 <br /> 7 <br />g. Drywall including all manufacturing processes, from initial blending of mined or 8 <br />synthetic gypsum plaster and additives through cutting and drying of 9 <br />sandwiched panels; or 10 <br /> 11 <br />h. Engineered wood including all manufacturing processes from the initial 12 <br />combination of constituent materials until the wood product is in its final form. 13 <br /> 14 <br />If a Construction Material is not manufactured in the United States it shall be 15 <br />considered a Foreign Construction Material. 16 <br /> 17 <br />2. Excluded Material: A material where Buy America requirements do not apply. This 18 <br />includes the following: 19 <br /> 20 <br />a. Materials excluded by Section 70917(c) of the Buy America, Build America Act 21 <br />with respect to aggregates this includes cement and cementitious materials, 22 <br />aggregates such as stone, sand, or gravel or aggregate binding agents or 23 <br />additives. These materials shall be classified as excluded materials based on 24 <br />the composition when brought to the work site. It also includes combinations of 25 <br />these excluded materials when mixtures of Excluded Materials are delivered to 26 <br />the work site without final form for incorporation into the project (i.e. wet concrete 27 <br />and HMA). If they are formed prior to delivery, they are a Manufactured Product 28 <br />and not an Excluded Material. 29 <br /> 30 <br />b. Temporary materials that are not being permanently incorporated into the 31 <br />project. 32 <br /> 33 <br />c. Raw or minimal processed materials where the article, material, or supply does 34 <br />not fall into any of the categories, as it is not a Manufactured Product, an Iron or 35 <br />Steel Product, or a Construction Material and when these materials are 36 <br />delivered to the work site without final form for incorporation into the product (i.e. 37 <br />seed mix and topsoil). If they are formed prior to delivery, they are a 38 <br />Manufactured Product and not an Excluded Material. 39 <br /> 40 <br />3. Iron or Steel Product: An article, material, or supply that consist of wholly or 41 <br />predominantly of iron or steel or a combination of both. To be considered 42 <br />predominantly of iron or steel or a combination of both means that the cost of the iron 43 <br />and steel content exceeds 50 percent of the total cost of all its components. The 44 <br />cost of iron and steel is based on a good faith estimate of the cost of the iron or steel 45 <br />components. 46 <br /> 47 <br />4. Manufactured Product: A Manufactured Product includes any item produced as a 48 <br />result of the manufacturing process. Items that should be treated as a manufactured 49 <br />product (rather than a construction material) are: 1) items that consist of two or more 50 <br />of the listed construction materials that have been combined together through a 51 <br />manufacturing process, and 2) items that include at least one of the listed 52
The URL can be used to link to this page
Your browser does not support the video tag.