My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-23 May 6, 2025 <br /> <br /> 1 <br />d. Direct reduction. 2 <br /> 3 <br />2. Rolling, heat treating, and any other similar processing. 4 <br /> 5 <br />3. Fabrication of the products: 6 <br /> 7 <br />a. Spinning wire into cable or strand. 8 <br /> 9 <br />b. Corrugating and rolling into culverts. 10 <br /> 11 <br />c. Shop fabrication. 12 <br /> 13 <br />A certification of materials origin will be required for all iron or steel products prior to such 14 <br />items being incorporated into the permanent work. The Contractor will not receive 15 <br />payment until the certification is received by the Engineer. The certification shall be on 16 <br />WSDOT Form 350-109 provided by the Engineer, or such other form the Contractor 17 <br />chooses, provided it contains the same information as WSDOT Form 350-109. 18 <br /> 19 <br />Manufactured Products 20 <br />Due to a nationwide waiver, Buy America requirements do not apply to Manufactured 21 <br />Products except as follows: 22 <br /> 23 <br />1. When a precast concrete product is classified as a Manufactured Product, the 24 <br />components that are an Iron or Steel Product shall follow the “Iron and Steel 25 <br />Requirements” of this Specification. 26 <br /> 27 <br />2. When an electronic hardware system such as an intelligent transportation 28 <br />system is classified as a Manufactured Product, the cabinets and the other 29 <br />enclosures of such systems that are an Iron or Steel Product shall follow the 30 <br />“Iron and Steel Requirements” of this Specification. 31 <br /> 32 <br />Construction Material Requirements 33 <br />A Contractor provided certification of materials origin will be required before each 34 <br />progress estimate or payment. The Contractor will not receive payment until the 35 <br />certification is received by the Engineer. The Contractor shall certify that all Construction 36 <br />Materials installed during the current progress estimate period meet the Buy America 37 <br />requirements. The certification shall be on WSDOT Form 350-111 provided by the 38 <br />Engineer, or such other form the Contractor chooses, provided it contains the same 39 <br />information as WSDOT Form 350-111. 40 <br /> 41 <br />Waiver for De Minimis Costs 42 <br />Minor amounts of Foreign Construction Materials may be utilized in this project, provided 43 <br />that the total cost of the Foreign Construction Materials does not exceed $1,000,000 and 44 <br />does not exceed 5 percent of the total applicable material costs calculated as follows: 45 <br /> 46 <br /> <br /> < 0.05 47 <br /> 48 <br />The total applicable material costs shall be the sum of the costs all Construction Materials, 49 <br />all Iron or Steel Products, and all Manufactured Products. Total applicable material costs 50 <br />does not include Excluded Materials. 51
The URL can be used to link to this page
Your browser does not support the video tag.