My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-33 May 6, 2025 <br /> <br />on a furnish-and-install contract, it has not performed a CUF and the cost of materials 1 <br />cannot be counted toward DBE COA Goal. Leasing of equipment from a leasing 2 <br />company is allowed. However, leasing/purchasing equipment from the Contractor is 3 <br />not allowed. Lease agreements shall be provided prior to the subcontractor 4 <br />beginning Work. Any use of the Contractor’s equipment by a DBE will not be credited 5 <br />as countable participation. 6 <br /> 7 <br />The DBE does not perform a CUF if its role is limited to that of an extra participant in 8 <br />a transaction, contract, or project through which the funds are passed in order to 9 <br />obtain the appearance of DBE participation. 10 <br /> 11 <br />In order for a DBE traffic control company to be considered to be performing a CUF, 12 <br />the DBE must be in control of its work inclusive of supervision. The DBE shall employ 13 <br />a Traffic Control Supervisor who is directly involved in the management and 14 <br />supervision of the traffic control employees and services. 15 <br /> 16 <br />The following are some of the factors that the Engineer will use in determining 17 <br />whether a DBE trucking company is performing a CUF: 18 <br /> 19 <br />1. The DBE shall be responsible for the management and supervision of the 20 <br />entire trucking operation for which it is responsible on the contract. The 21 <br />owner demonstrates business related knowledge, shows up on site and is 22 <br />determined to be actively running the business. 23 <br /> 24 <br />2. The DBE itself shall own and operate at least one fully licensed, insured, 25 <br />and operational truck used on the Contract. The drivers of the trucks owned 26 <br />and leased by the DBE must be exclusively employed by the DBE and 27 <br />reflected on the DBE’s payroll. 28 <br /> 29 <br />3. Lease agreements for trucks shall indicate that the DBE has exclusive use 30 <br />of and control over the truck(s). This does not preclude the leased truck 31 <br />from working for others provided it is with the consent of the DBE and the 32 <br />lease provides the DBE absolute priority for use of the leased truck. 33 <br /> 34 <br />4. Leased trucks shall display the name and identification number of the DBE. 35 <br /> 36 <br />Truck Unit Listing Log 37 <br />In addition to the subcontracting requirements of Section 1-08.1, each DBE trucking 38 <br />firm shall submit supplemental information consisting of a completed primary 39 <br />DBE/FSBE Truck Unit Listing Log (DOT Form 350-077) and all Rental/Lease 40 <br />agreements (if applicable). The supplemental information shall be submitted in an 41 <br />electronic format to the Engineer prior to any trucking services being performed for 42 <br />DBE credit. Incomplete or incorrect supplemental information will be returned for 43 <br />correction. The corrected Primary Truck Unit Listing Log and any Updated Primary 44 <br />Truck Unit Listing Logs shall be submitted and accepted by the Engineer no later 45 <br />than ten calendar days of utilizing applicable trucks. Failure to submit or update the 46 <br />DBE Truck Unit Listing Log may result in trucks not being credited as DBE 47 <br />participation. 48 <br /> 49 <br />Each DBE trucking firm shall complete a daily DBE/FSBE Truck Unit Listing Log 50 <br />(DOT Form 350-077) for each day that the DBE performs trucking services for DBE 51
The URL can be used to link to this page
Your browser does not support the video tag.