My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-72 May 6, 2025 <br /> <br />5-04.3(3) Equipment 1 <br /> 2 <br />5-04.3(3)A Mixing Plant 3 <br />Plants used for the preparation of HMA shall conform to the following requirements: 4 <br /> 5 <br />1. Equipment for Preparation of Asphalt Binder – Tanks for the storage of 6 <br />asphalt binder shall be equipped to heat and hold the material at the required 7 <br />temperatures. The heating shall be accomplished by steam coils, electricity, or 8 <br />other approved means so that no flame shall be in contact with the storage tank. 9 <br />The circulating system for the asphalt binder shall be designed to ensure proper 10 <br />and continuous circulation during the operating period. A valve for the purpose of 11 <br />sampling the asphalt binder shall be placed in either the storage tank or in the 12 <br />supply line to the mixer. 13 <br /> 14 <br />2. Thermometric Equipment – An armored thermometer, capable of detecting 15 <br />temperature ranges expected in the HMA mix, shall be fixed in the asphalt binder 16 <br />feed line at a location near the charging valve at the mixer unit. The thermometer 17 <br />location shall be convenient and safe for access by Inspectors. The plant shall 18 <br />also be equipped with an approved dial-scale thermometer, a mercury actuated 19 <br />thermometer, an electric pyrometer, or another approved thermometric 20 <br />instrument placed at the discharge chute of the drier to automatically register or 21 <br />indicate the temperature of the heated aggregates. This device shall be in full 22 <br />view of the plant operator. 23 <br /> 24 <br />3. Heating of Asphalt Binder – The temperature of the asphalt binder shall not 25 <br />exceed the maximum recommended by the asphalt binder manufacturer nor shall 26 <br />it be below the minimum temperature required to maintain the asphalt binder in a 27 <br />homogeneous state. The asphalt binder shall be heated in a manner that will 28 <br />avoid local variations in heating. The heating method shall provide a continuous 29 <br />supply of asphalt binder to the mixer at a uniform average temperature with no 30 <br />individual variations exceeding 25°F. Also, when a WMA additive is included in 31 <br />the asphalt binder, the temperature of the asphalt binder shall not exceed the 32 <br />maximum recommended by the manufacturer of the WMA additive. 33 <br /> 34 <br />4. Sampling and Testing of Mineral Materials – The HMA plant shall be equipped 35 <br />with a mechanical sampler for the sampling of the mineral materials. The 36 <br />mechanical sampler shall meet the requirements of Section 1-05.6 for the 37 <br />crushing and screening operation. The Contractor shall provide for the setup and 38 <br />operation of the field-testing facilities of the Contracting Agency as provided for in 39 <br />Section 3-01.2(2). 40 <br /> 41 <br />5. Sampling HMA – The HMA plant shall provide for sampling HMA by one of the 42 <br />following methods: 43 <br /> 44 <br />a. A mechanical sampling device attached to the HMA plant. 45 <br /> 46 <br />b. Platforms or devices to enable sampling from the hauling vehicle without 47 <br />entering the hauling vehicle. 48
The URL can be used to link to this page
Your browser does not support the video tag.